40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Sep 7 12:03:49 2011, steve, Update, VAC, Pump down has started 
    Reply  Wed Sep 7 18:19:37 2011, steve, HowTo, VAC, stop pump down for overnight 
       Reply  Wed Sep 7 21:45:16 2011, kiwamu, Update, VAC, pump stopped. Pressure is at 450 mtorr vacuum.png
       Reply  Thu Sep 8 10:50:44 2011, steve, Update, VAC, pumpdown #71 comleted pd#71.jpgmaglevpd.jpg
Message ID: 5363     Entry time: Wed Sep 7 21:45:16 2011     In reply to: 5361
Author: kiwamu 
Type: Update 
Category: VAC 
Subject: pump stopped. Pressure is at 450 mtorr 

I stopped puming at 9:30 PM and the pressure in P1 is at 450 mtorr.

I followed exactly he procedure that Steve noted on his elog entry.

Here is a plot of the histroy of our pumping today.

vacuum.png

Quote from #5361

 1, close V3

2, close RV1 with torque wheel

3, turn off PR1 & 3

4, disconnect metal hose between RV1 and PR3

 I will start the Maglev tomorrow morning.

ELOG V3.1.3-