40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Aug 3 09:40:13 2011, steve, Update, VAC, vent pzt2011Aug3.png
    Reply  Wed Aug 3 11:34:59 2011, kiwamu, Update, VAC, Re: vent 
Message ID: 5104     Entry time: Wed Aug 3 09:40:13 2011     Reply to this: 5105
Author: steve 
Type: Update 
Category: VAC 
Subject: vent 

The vacuum system is coming up to atm. The vent was started with slow N2 flow. The PSL output is blocked 2 places on the table.

Attachment 1: pzt2011Aug3.png  78 kB  | Hide | Hide all
pzt2011Aug3.png
ELOG V3.1.3-