40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 4977     Entry time: Fri Jul 15 17:42:21 2011
Author: Sonali 
Type: Update 
Category: Green Locking 
Subject: PSL layout for superposition of the PSL,ETMX and ETMY beams. 

The fibres carrying the beams from the ETMX as well as the ETMY have been routed to the PSL table now.

A part of the PSL beam has to be superposed on the fibre-outputs to obtain a beat signal. We have located a stray beam on the PSL(which is currently being dumped) which we plan to redirect for the same. The layout of the plan is attached herewith.

Attachment 1: PSL_change1.pdf  2.221 MB  | Hide | Hide all
PSL_change1.pdf
Attachment 2: PSLnewspace1.pdf  501 kB  Uploaded Mon Jul 18 17:45:16 2011  | Hide | Hide all
PSLnewspace1.pdf
ELOG V3.1.3-