40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 4879     Entry time: Fri Jun 24 17:04:25 2011
Author: Nicole 
Type: Update 
Category: SUS 
Subject: Basic Laser Safety Training; Moved TT Mirror; Horizontal Displacement Mech Plan 

Today Ishwita, Sonali, and I completed basic laser safety training with Peter King. I completed the Laser Safety Quiz and have turned in my certificate sheet.

I just need to turn in a signed copy of the Lab Safety Checklist to SFP (which I can now have signed by Koji after completing the course).

 

Steve and I have removed the TT mirror from the clean box. It is now on the small optical table in the lab that I have been working on.  Thanks to Steve, all of the mechanical components for the horizontal displacement measurement experiment are compiled and on the small optical table. Here is a photo of the small optical table with the gathered components. CompiledParts.JPG

The plan is to attach the slider and the shaker directly to the black mounting plate. On the slider, we we then place the smaller black mounting plate (with the lip). The lip will attach to the shaker. We know exactly where to drill and everything is lined up. The shaker will be placed on the smaller black mounting plate (with the lip).  The assembly will begin on Monday.

 

Here is a photo of the planned set-up for the shaker and the horizontal slider + mounting base.

 HorizontalDispMount.JPG

ELOG V3.1.3-