40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Fri Apr 25 13:53:11 2008, josephb, Summary, Computers, Network setup 40m_network_90.pdf
    Reply  Mon May 5 11:04:30 2008, rob, Omnistructure, Computers, Network setup 
Message ID: 449     Entry time: Fri Apr 25 13:53:11 2008     Reply to this: 464
Author: josephb 
Type: Summary 
Category: Computers 
Subject: Network setup 
This is the promised more in detail summary from Andrey's log ID 444.

What we did was go around to each hub, one at a time, unplug the network connection, and figure out which light on which hub went out. We then, went back to the control room, confirmed that we were still able to talk to the devices connected to the hub, and if not, rebooted them. This process was repeated for each hub.

As it stands, the hubs located at the ends of arms (in racks 1X4 and 1Y9) are connected to the really old 24 port 10 Base T hub located in 1Y7. In addition, the 5 port SMC hub is plugged into the 8 port SMC switch in 1Y5 (which actually has enough ports to simply move all the connections over to it, so I'm not sure why there are two...).

All other hubs/switches are connected back to the control room 24 port switch.

Attached is a simple diagram of the network connections for the 40m lab.
Attachment 1: 40m_network_90.pdf  18 kB  Uploaded Fri Apr 25 14:54:55 2008  | Hide | Hide all
40m_network_90.pdf
ELOG V3.1.3-