40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Tue Mar 8 06:29:06 2011, kiwamu, Update, Green Locking, Intensity noise setup
|
Wed Mar 9 04:46:13 2011, kiwamu, Update, Green Locking, more intensity noise measurement 
|
Wed Mar 9 18:17:11 2011, kiwamu, Update, Green Locking, Intensity noise coupling 
|
Thu Mar 10 14:06:54 2011, kiwamu, Update, Green Locking, Intensity noise limits the beatnote sensitivity 
|
Thu Mar 10 14:22:58 2011, kiwamu, Update, Green Locking, Intensity noise limits the beatnote sensitivity
|
Thu Mar 10 14:29:05 2011, Koji, Update, Green Locking, Intensity noise limits the beatnote sensitivity
|
Thu Mar 10 14:30:53 2011, rana, Update, Green Locking, Intensity noise limits the beatnote sensitivity
|
Thu Mar 10 16:00:53 2011, Aidan, Joe, Update, Green Locking, Intensity stabilization loop using beatnote DC.    
|
Thu Mar 10 21:45:34 2011, rana, Update, Green Locking, Intensity stabilization loop using beatnote DC.
|
|
Message ID: 4403
Entry time: Thu Mar 10 21:45:34 2011
In reply to: 4401
|
Author: |
rana |
Type: |
Update |
Category: |
Green Locking |
Subject: |
Intensity stabilization loop using beatnote DC. |
|
|
Ridiculous and hacky. Digital stabilization removed as well as the old "leave a pile of equipment on a stool" strategy.
We used a a BNC cable to send a pickoff of the beam before the recombination to the end via an SR560. |