Message ID: 4094     Entry time: Thu Dec 23 13:30:09 2010     In reply to: 4089
Author: steve 
Type: Configuration 
Category: VAC 
Subject: slow pumpdown complete 

The pump down continued this morning by the removal of the butterfly valve. Two roughing pumps were used to reach 500 mTorr

The Maglev monitoring MEDM screen "Rotating" indicator is not working. It is on all times. Please look at Maglev controller monitor for real information.

Pump down is completed.           

Configuration: vacuum normal after 86 days at atm               CC1 = 1e-5 Torr                  

                      IFO is hungry for light (and maybe some goulash with a little paprikash too)