40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 4083     Entry time: Tue Dec 21 16:20:09 2010
Author: steve 
Type: Configuration 
Category: VAC 
Subject: pumpdown has started 

Slow pumpdown of rebuilt IFO-mark4 started at 3pm today.

We are at 680Torr at this minute with 1.5 Torr/min speed.

ELOG V3.1.3-