What else?
v: Edit on Dec 15 10PM
v: Edit on Dec 16 10PM
JD: We should check OSEMs for all optics *after* table leveling. Some of them (esp. BS and ITMX) are currently close to their limits right now.
KA: Check green alignment.
Take photos of the tables.
Fix the leveling weights
Location Optics Action
--------------------------------------------------------------
@ITMX - v POX alignment
v POP1/POP2 alignment
v Table Leveling
@ITMY - POY mirror replacement (45deg->0deg) / alignment
v SR2-TT alignment
v SRM Tower alignment / EQ-stop release
v SRM alignment
v SRM OSEM
vvSRM OPLEV (X2) install (VIS)/ alignment
v ITMY OPLEV (X2) install (VIS)/ alignment
v OM1/OM2 install (DLC 45deg)/ alignment
v Table Leveling
@BSC - v OM3 install (DLC 45deg/ alignment)
v OM4(PZT) neutralize, adjustment
IPPOS steering alignment
v BS OPLEV alignment
v PRM OPLEV(x2) alignment
Beam dumps
Table Leveling
@IMC - v REFL mirror replacement (45deg->0deg)
@ETMX - Al foil removal
Table Leveling
@ETMY - ETMY damping
OSEM
OPLEV
Al foil removal
Table Leveling
@OMC - v OM5(PZT) neutralize, adjustment
@ITM/ETM - Mirror Wiping
|