40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 4018     Entry time: Mon Dec 6 23:33:15 2010
Author: Jenne 
Type: Update 
Category: SUS 
Subject: ETMU05 winched, balanced, glued!!!!!! 

[Suresh, Jenne]

We Finished!!!

ETMU05 (ETMY) had its wire winched to the correct height, was balanced, and had the standoff glued.  Since it's kind of like final exam week at Caltech, Suresh had his suspension exam today, and did most of this work himself, with me hanging around and watching. 

As you can see in my almost entirely green table, all that is left to do with the whole suspensions project is bake the optic (hopefully Bob has time / space this week), and then stick it in the chamber!  Hooray!!! (Can you tell I'm excited to not spend too much more time in the cleanroom?)

The table:

StatusTable.png

ELOG V3.1.3-