40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 4008     Entry time: Fri Dec 3 14:34:23 2010
Author: rana 
Type: Update 
Category: CDS 
Subject: fooling around in the FB rack 

This morning (~0100) I started to redo some of the wiring in the rack with the FB in it. This was in an effort to activate the new Megatron (Sun Fire 4600) which we got from Rolf.

Its sitting right above the Frame Builder (FB). The fibers in there are a rats nest. Someone needs to team up with Joe to neaten up the cabling in that rack - its a mini-disaster.

While fooling around in there I most probably disturbed something, leading to the FB troubles today.

ELOG V3.1.3-