Entry  Tue Nov 23 23:13:40 2010, kiwamu, Summary, CDS, plan: we will install C1LSC 
    Reply  Thu Nov 25 02:49:39 2010, kiwamu, Update, CDS, installation of C1LSC: still going on DSC_2723_ss.jpgDSC_2724_ss.jpgDSC_2727_ss.jpg
Message ID: 3986     Entry time: Thu Nov 25 02:49:39 2010     In reply to: 3982
Author: kiwamu 
Type: Update 
Category: CDS 
Subject: installation of C1LSC: still going on 

 [Joe, Kiwamu]

 We tried installing C1LSC but it's not completely done yet due to the following issues.

    (1)  A PCIe optical fiber which is supposed to connect C1LSC and its IO chasis is broken at a high probability.

    (2)  Two DAC boards (blue and golden board) are missing.

 We will ask the CDS people at Downs and take some more of those stuff from there.


( works we did )

 - took the whole C1ASC crate out from the 1Y3 rack.

 - installed an IO chasis to the place where C1ASC was.

 - strung a timing optical fiber to the IO chasis.

 - checked the functionality of the PICe optical fiber and found it doesn't work.

 

 

Fig.1  c1asc taken out from the rack                                                                         Fig.2 IO chasis installed to the rack

DSC_2723_ss.jpg      DSC_2724_ss.jpg

 

Fig.3 PCIe extension fiber (red arrow for an obvious bended point) 

DSC_2727_ss.jpg 