Message ID: 3647     Entry time: Tue Oct 5 11:42:20 2010
Author: kiwamu 
Type: Summary 
Category: Green Locking 
Subject: developing green locking plant 

 With a help from Joe, I made a diagram of the simulated plant for green locking in order to get better understanding and consensus.

Eventually these simulated plants will help us developing (sometimes debugging) the digital control systems.

Here is the diagram which tells us how we will setup and link the control/plant models and on which machine they will be running.

green_sm3.png

 

Basically upper side represents the realtime control, and the lower side is the simulated plant.

The models are talking to each other via either a local shared memory (orange line) or the reflective memory network (purple line).

 Each model is stil not systematically named, at some point we have to have an absolute standard for naming the models.

 

- current model names -

  GCV = Green Control model at Vertex

  GCX(Y) = Green Control model at X (Y) end

  GPV = Green Plant model at Vertex

 

 - things to be done -

1. let the RFM work

2. revise the old plant models : SUP, SPX(Y) and LSP

 