40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 3403     Entry time: Wed Aug 11 16:56:00 2010
Author: Koji 
Type: Summary 
Category: Environment 
Subject: Covering of the IFO 

Katharine, Sharmila, Gopal, Kiwamu, Jenne, Aidan, Steve, and Koji

A guy from the carpenter shop has done the drilling work in the morning.

In the afternoon we wrapped the central part of the interferometer with plastic sheets in order to avoid the dusts from the tile ripping that will happen tomorrow.

Attachment 1: IMG_2732.jpg  303 kB  | Hide | Hide all
IMG_2732.jpg
ELOG V3.1.3-