Entry  Thu Aug 5 00:17:41 2010, Koji, Update, PSL, PSL preparation work 
    Reply  Thu Aug 5 22:36:11 2010, Koji, Update, PSL, PSL preparation work 
       Reply  Fri Aug 6 08:09:15 2010, steve, Update, PSL, PSL preparation work 
       Reply  Fri Aug 6 20:00:03 2010, Koji, Update, PSL, PSL preparation work PSL_cable_map.pdf
Message ID: 3370     Entry time: Thu Aug 5 22:36:11 2010     In reply to: 3364     Reply to this: 3371   3381
Author: Koji 
Type: Update 
Category: PSL 
Subject: PSL preparation work 

PSL preparation work

Aug 5th 10am-4pm?: (Kiwamu, Alberto, Koji)

  • Removing the unused cables around the PSL table and the control room

Aug 6th 10am-4pm?: (Kiwamu (ex. noon-2pm), Alberto, Koji, Jenne ('till noon) )

  • Labeling the cables to be disconnected / making the records ==> All
  • Removals
    • the big nuts at the side of the PSL table ==> Steve
    • the cable ties on the PSL frame ==> Easy
    • Innolight 2W ==> Kiwamu
    • the green pickoff optics at the edge, if necessary ==> Kiwamu talking with Steve
    • Optics on the shelf ==> Jenne / Koji
    • Oscilloscopes on the shelf ==> Jenne / Koji
    • CCD camera connections (optional, as far as not critical for the operation)
  • Put poles on the table (for the plastic sheet) ==> Alberto / Koji

Aug 9th  9am-5pm: (Steve, Jenne, Alberto, Koji)

  • Disconnecting the cables ==> All
  • Shutting down the PSL ==> Steve/Koji
    • Draining the cooling water  ==> Steve
  • Removals
    • The accelerometers ==> Jenne
    • the PSL chamber ==> Steve
    • Periscopes ==> Alberto
  • Sealing of the table with the plastic sheets

 

  • The chiller is planned to go to MIT

 