PSL preparation work
Aug 5th 10am-4pm?: (Kiwamu, Alberto, Koji)
Removing the unused cables around the PSL table and the control room
Aug 6th 10am-4pm?: (Kiwamu (ex. noon-2pm), Alberto, Koji, Jenne ('till noon) )
- Labeling the cables to be disconnected / making the records ==> All
- Removals
- the big nuts at the side of the PSL table ==> Steve
- the cable ties on the PSL frame ==> Easy
- Innolight 2W ==> Kiwamu
- the green pickoff optics at the edge, if necessary ==> Kiwamu talking with Steve
- Optics on the shelf ==> Jenne / Koji
- Oscilloscopes on the shelf ==> Jenne / Koji
- CCD camera connections (optional, as far as not critical for the operation)
- Put poles on the table (for the plastic sheet) ==> Alberto / Koji
Aug 9th 9am-5pm: (Steve, Jenne, Alberto, Koji)
- Disconnecting the cables ==> All
- Shutting down the PSL ==> Steve/Koji
- Draining the cooling water ==> Steve
- Removals
- The accelerometers ==> Jenne
- the PSL chamber ==> Steve
- Periscopes ==> Alberto
- Sealing of the table with the plastic sheets
- The chiller is planned to go to MIT
|