Fri Jul 30 09:55:34 2010, steve, Configuration, VAC, slow pumpdown has started
|
Fri Jul 30 17:54:55 2010, steve, HowTo, VAC, How to stop and start slow pumpdown
|
Fri Jul 30 22:07:42 2010, Koji, HowTo, VAC, How to stop and start slow pumpdown
|
Sat Jul 31 10:12:05 2010, kiwamu, Update, VAC, Re: How to stop and start slow pumpdown
|
Sat Jul 31 14:59:33 2010, kiwamu, Update, VAC, Re: How to stop and start slow pumpdown
|
Mon Aug 2 10:26:15 2010, steve, Configuration, VAC, very slow pumpdown completed
|
|
Message ID: 3331
Entry time: Fri Jul 30 09:55:34 2010
Reply to this: 3336
3347
|
Author: |
steve |
Type: |
Configuration |
Category: |
VAC |
Subject: |
slow pumpdown has started |
|
|
Bob and Steve closed BS chamber with the help of the manual Genie lift and the pump down started. The PSL shutter was closed and manual block was placed in the beam path. High voltage power supplies were checked to be off.
Pumping speed ~ 1 Torr/min was achieved at 1/8 of a turn opened roughing valve RV1 |
|
|