July
29 Thu BS chamber work: Move cable towers / green steering mirrors / (2 TTs with TT charactrization) / Put the heavy door by 5PM.
30 Fri Pumping down
31 Sat WFS work by Nancy
Aug
1 Sun - 5 Thu WFS work by Nancy
5 Thu PSL Table prep
6 Fri PSL Table prep / Likely to shut down the PSL
9 Mon PSL Table prep / shutting down of the PSL (optional)
10 Tue PSL box Frame lifting
12 Thu PSL table tapping
16 Mon - 17 Tue concrete pouring preparation
19 Thu - 23 Fri Tripod placement
24 Tue - 26 Thu concrete pouring |