Entry  Thu Jul 29 12:31:09 2010, Koji, Summary, General, Lab Schedule PSL_work_schedule.pdf
    Reply  Fri Jul 30 14:53:09 2010, steve, Update, General, PSL table leg upgrade psllegs.PDF
Message ID: 3318     Entry time: Thu Jul 29 12:31:09 2010     Reply to this: 3333
Author: Koji 
Type: Summary 
Category: General 
Subject: Lab Schedule 

July
29 Thu BS chamber work: Move cable towers / green steering mirrors / (2 TTs with TT charactrization) / Put the heavy door by 5PM.
30 Fri Pumping down
31 Sat WFS work by Nancy

Aug
1 Sun - 5 Thu WFS work by Nancy
5 Thu PSL Table prep
6 Fri PSL Table prep / Likely to shut down the PSL

9 Mon PSL Table prep / shutting down of the PSL (optional)
10 Tue PSL box Frame lifting
12 Thu PSL table tapping

16 Mon - 17 Tue concrete pouring preparation
19 Thu - 23 Fri Tripod placement
24 Tue - 26 Thu concrete pouring

Attachment 1: PSL_work_schedule.pdf  45 kB  Uploaded Thu Jul 29 13:38:57 2010  | Show | Show all