40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 2730     Entry time: Mon Mar 29 18:41:34 2010
Author: Koji 
Type: Configuration 
Category: SUS 
Subject: Started to build TTs 

Steve and Koji

WE started to build 5 TTs. 4 of them are used in the recycling cavities. One is the spare.

We built the structure and are building the cantilever springs.

Attachment 1: IMG_2348.jpg  61 kB  | Show | Show all
ELOG V3.1.3-