40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Fri Feb 19 13:28:44 2010, Koji, Update, General, Prep for Power Supply Stop  screen_shot.png
    Reply  Sun Feb 21 17:44:35 2010, rana, Update, General, Prep for Power Supply Stop  
       Reply  Mon Feb 22 07:25:58 2010, rana, Update, General, Prep for Power Supply Stop  
          Reply  Mon Feb 22 09:45:34 2010, josephb, Update, General, Prep for Power Supply Stop  
             Reply  Mon Feb 22 11:42:48 2010, Koji, Update, General, Prep for Power Supply Stop  
Message ID: 2625     Entry time: Mon Feb 22 11:42:48 2010     In reply to: 2622
Author: Koji 
Type: Update 
Category: General 
Subject: Prep for Power Supply Stop  

Turned on the power supply for the oplev lasers.
Turned on the power of the aux NPRO.
Turned on some of the Sorensen at 1X1.
Fixed the thermal output to round -4.0.
Locked PMC / MZ.

Waiting for the computers recovering.

ELOG V3.1.3-