40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 2583     Entry time: Tue Feb 9 17:18:45 2010
Author: josephb 
Type: Summary 
Category: Computers 
Subject: Locking Y arm successful with fully replaced front-end for ITMY 

We were able to lock the Y-arm using Megatron and the RCG generated code, with nothing connected to c1iscey.

All relevant cables were disconnected from c1iscey and plugged into the approriate I/O ports, including the digital output.  Turns out the logic for the digital output is opposite what I expected and added XOR bitwise operators in the tst.mdl model just before it went out to DO board.  Once that was added, the Y arm locked within 10 seconds or so.  (Compared to the previous 30 minutes trying to figure out why it wouldn't lock).

ELOG V3.1.3-