40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Mon Jan 11 09:18:44 2010, Alberto, Update, General, Measurement running 
    Reply  Mon Jan 11 11:06:53 2010, Alberto, Update, ABSL, Measurement running 
Message ID: 2500     Entry time: Mon Jan 11 09:18:44 2010     Reply to this: 2502
Author: Alberto 
Type: Update 
Category: General 
Subject: Measurement running 

I'm working on the AbsL experiment. A measurement which involved the PRC locked is running at the moment.

Please make sure of not interfering with the interferometer until it is done. Thank you.

ELOG V3.1.3-