40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Tue Aug 25 11:02:39 2009, rana, Summary, PSL, Temperature Box D980400-B.pdf
    Reply  Tue Aug 25 18:42:42 2009, steve, Update, PSL, reference cavity temp box temporarly out of order 
       Reply  Tue Aug 25 21:36:28 2009, Alberto, Update, PSL, reference cavity temp box temporarly out of order 2009-08-25_PSLtrend.png
       Reply  Tue Aug 25 21:55:11 2009, rana, Update, PSL, reference cavity temp box temporarly out of order Untitled.pngrc-heater.jpg
          Reply  Wed Aug 26 15:42:17 2009, Alberto, Update, PSL, reference cavity temp box temporarly out of order 
             Reply  Wed Aug 26 16:11:41 2009, Alberto, Update, PSL, reference cavity temp box temporarly out of order 
                Reply  Wed Aug 26 16:31:34 2009, steve, Update, PSL, reference cavity temp box temporarly out of order 
Message ID: 1945     Entry time: Tue Aug 25 21:36:28 2009     In reply to: 1943
Author: Alberto 
Type: Update 
Category: PSL 
Subject: reference cavity temp box temporarly out of order 

 

 Is that the reason of the PSL craziness tonight? See attachment.

Attachment 1: 2009-08-25_PSLtrend.png  10 kB  | Hide | Hide all
2009-08-25_PSLtrend.png
ELOG V3.1.3-