Entry  Thu Aug 4 19:01:59 2022, Tega, Update, Computers, Front-end machine in supermicro boxes IMG_20220804_184444473.jpgIMG_20220804_191658206.jpgIMG_20220804_185336240.jpgIMG_20220804_185023002.jpg
    Reply  Mon Aug 8 17:16:51 2022, Tega, Update, Computers, Front-end machine setup IMG_20220808_170349717.jpg
       Reply  Wed Aug 10 20:51:14 2022, Tega, Update, Computers, CDS upgrade Front-end machine setup IMG_20220810_171002928.jpgIMG_20220810_171019633.jpg
          Reply  Tue Aug 16 18:22:59 2022, Tega, Update, Computers, c1teststand rack mounting for CDS upgrade IMG_20220816_180157132.jpgIMG_20220816_175125874.jpg
             Reply  Wed Aug 17 11:10:51 2022, rana, Update, Computers, c1teststand rack mounting for CDS upgrade 
             Reply  Mon Aug 22 19:02:15 2022, Tega, Update, Computers, c1teststand rack mounting for CDS upgrade II IMG_20220822_185437763.jpgIMG_20220822_131340214.jpgc1bhd.jpegc1lsc.jpeg
                Reply  Tue Aug 23 22:30:24 2022, Tega, Update, Computers, c1teststand OS upgrade - I 
                Reply  Fri Aug 26 14:05:09 2022, Tega, Update, Computers, rack reshuffle proposal for CDS upgrade 6x
                   Reply  Sun Aug 28 23:14:22 2022, Jamie, Update, Computers, rack reshuffle proposal for CDS upgrade 
                      Reply  Mon Aug 29 15:15:46 2022, Tega, Update, Computers, 3 FEs from LLO got delivered today IMG_20220829_145533452.jpgIMG_20220829_144801365.jpg
                         Reply  Tue Aug 30 15:21:27 2022, Tega, Update, Computers, 3 FEs from LHO got delivered today IMG_20220830_144925325.jpgIMG_20220830_142307495.jpgIMG_20220830_143059443.jpg
                   Reply  Mon Sep 19 20:21:06 2022, Tega, Update, Computers, 1X7 and 1X6 work IMG_20220919_204013819.jpgIMG_20220919_203541114.jpgIMG_20220919_203458952.jpg
                      Reply  Tue Sep 20 23:06:23 2022, Tega, Update, Computers, Setup the 6 new front-ends to boot off the FB1 clone IMG_20220921_084220465.jpgdolphin_err_init_state.pngdolphin_final_state.png
                         Reply  Wed Sep 21 17:16:14 2022, Tega, Update, Computers, Setup the 6 new front-ends to boot off the FB1 clone 
                            Reply  Thu Sep 22 20:57:16 2022, Tega, Update, Computers, build, install and start 40m models on teststand  dolphin_state_plus_c1shimmer.pngFE_status_overview.png
                               Reply  Fri Sep 23 19:07:03 2022, Tega, Update, Computers, Work to improve stability of 40m models running on teststand  dolphin_state_all_green.pngdolphin_state_IPC_glitch.png
                            Reply  Thu Sep 29 15:12:02 2022, JC, Update, Computers, Setup the 6 new front-ends to boot off the FB1 clone 
                               Reply  Tue Oct 4 21:00:49 2022, Chris, Update, Computers, Failed takeover attempt with the new front ends 
                                  Reply  Thu Oct 6 07:29:30 2022, Chris, Update, Computers, Successful takeover attempt with the new front ends 
Message ID: 17144     Entry time: Mon Sep 19 20:21:06 2022     In reply to: 17108     Reply to this: 17148
Author: Tega 
Type: Update 
Category: Computers 
Subject: 1X7 and 1X6 work 

[Tega, Paco, JC]


We moved the GPS network time server and the Frequency distribution amplifier from 1X7 to 1X6 and the PEM AA, ADC adapter and Martian network switch from 1X6 to 1X7. Also mounted the dolphin IX switch at the rear of 1X7 together with the DAQ and martian switches. This cleared up enough space to mount all the front-ends, however, we found that the mounting brackets for the frontends do not fit in the 1X7 rack, so I have decided to mount them on the upper part of the test stand for now while we come up with a fix for this problem. Attachments 1 to 3 show the current state of racks 1X6, 1X7 and the teststand.

 

Attachment 1: Front of racks 1X6 and 1X7

Attachment 2: Rear of rack 1X7

Attachment 3: Front of teststand rack


Plan for the remainder of the week

Tuesday

  • Setup the 6 new front-ends to boot off the FB1 clone.
  • Test PCIe I/O cables by connecting them btw the front-ends and teststand I/O chassis one at a time to ensure they work
  • Then lay the fiber cables to the various I/O chassis.

Wednesday

  • Migrate the current models on the 6 front-ends to the new system.
  • Replace RFM IPC parts with dolphin IPC parts in c1rfm model running c1sus machine
  • Replace the RFM parts in c1iscex and c1iscey models
  • Drop c1daf and c1oaf models from c1isc machine, since the front-ends have only have 6 cores
  • Build and install models

Thursday [CAN I GET THE IFO ON THIS DAY PLEASE?]

  • Complete any remaining model work
  • Connect all I/O chassis to their respective (new) front-end and see if we can start the models (Need to think of a safe way to do this. Should we disconnect coil drivers b4 starting the models?)

Friday

  • Tie-up any loose ends
Attachment 1: IMG_20220919_204013819.jpg  3.005 MB  Uploaded Mon Sep 19 21:43:32 2022  | Hide | Hide all
IMG_20220919_204013819.jpg
Attachment 2: IMG_20220919_203541114.jpg  3.620 MB  Uploaded Mon Sep 19 21:43:49 2022  | Hide | Hide all
IMG_20220919_203541114.jpg
Attachment 3: IMG_20220919_203458952.jpg  4.310 MB  Uploaded Mon Sep 19 21:44:01 2022  | Hide | Hide all
IMG_20220919_203458952.jpg
ELOG V3.1.3-