40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Mon Aug 15 10:27:56 2022, Koji, Update, General, Recap of the additional measures for the outage prep PXL_20220812_234438097.jpgPXL_20220812_234655309.jpgPXL_20220812_234748559.jpgrn_image_picker_lib_temp_b5f3e38d-796c-4816-bc0e-b11ba3316cbe.jpgPXL_20220812_235429314.jpg
    Reply  Mon Aug 15 15:43:49 2022, Anchal, Update, General, Complete power shutdown and startup documentation 
       Reply  Mon Aug 15 18:06:07 2022, Anchal, Update, General, c1vac issues, 1 pressure gauge died 
          Reply  Mon Aug 15 20:09:18 2022, Koji, Update, General, c1vac issues, 1 pressure gauge died 
             Reply  Wed Aug 17 10:23:05 2022, Tega, Update, General, c1vac issues, pressure gauge replacement 
                Reply  Fri Nov 18 09:00:27 2022, JC, Update, VAC, Pressure Gauge Information 
Message ID: 17080     Entry time: Mon Aug 15 15:43:49 2022     In reply to: 17079     Reply to this: 17081
Author: Anchal 
Type: Update 
Category: General 
Subject: Complete power shutdown and startup documentation 

All steps taken have been recorded here:
https://wiki-40m.ligo.caltech.edu/Complete_power_shutdown_2022_08

ELOG V3.1.3-