Mon Feb 7 09:00:26 2022, Paco, Update, General, Scheduled power outage recovery
|
Mon Feb 7 15:32:48 2022, Yehonathan, Update, General, Y End laser controller
|
Mon Feb 7 16:53:02 2022, Koji, Update, General, Scheduled power outage recovery 
|
Wed Feb 9 11:56:24 2022, Anchal, Update, General, Bringing back CDS
|
Wed Feb 9 13:55:05 2022, Koji, Update, General, Bringing back CDS
|
Wed Feb 9 16:43:35 2022, Paco, Update, General, Scheduled power outage recovery - Locking mode cleaner(s)
|
Thu Feb 10 15:41:00 2022, Anchal, Update, General, Scheduled power outage recovery - Locking mode cleaner(s)
|
Thu Feb 10 17:57:48 2022, Anchal, Update, General, Scheduled power outage recovery - Locking mode cleaner(s)
|
Thu Feb 10 19:03:23 2022, Koji, Update, General, Scheduled power outage recovery - Locking mode cleaner(s)
|
Thu Feb 10 19:46:37 2022, Koji, Update, General, Scheduled power outage recovery - Locking mode cleaner(s)
|
Thu Feb 10 21:10:43 2022, Koji, Update, General, Video Mux setting reset 
|
Fri Feb 11 16:09:11 2022, Anchal, Update, General, Scheduled power outage recovery - Input power increased
|
Mon Feb 14 18:31:50 2022, Paco, Update, General, Scheduled power outage recovery - IMC recovery progress
|
Tue Feb 15 19:32:50 2022, Koji, Update, General, Scheduled power outage recovery - IMC recovery progress    
|
Tue Feb 15 19:40:02 2022, Koji, Update, General, IMC locking
|
Wed Feb 16 15:19:41 2022, Anchal, Update, General, Reconfigured MC reflection path for low power
|
Wed Feb 23 15:08:57 2022, Anchal, Update, General, Removed extra beamsplitter in MC WFS path
|
Thu Feb 24 14:32:57 2022, Anchal, Update, General, MC RFPD DCMON channel got stuck to 0
|
Thu Feb 24 19:26:32 2022, Anchal, Update, General, IMC Locking
|
Sun Feb 27 00:37:00 2022, Koji, Update, General, IMC Locking Recovery    
|
Sun Feb 27 01:12:46 2022, Koji, Update, General, IMC manual alignment procedure
|
Fri Feb 11 11:17:00 2022, Anchal, Update, General, Scheduled power outage recovery
|
Mon Feb 14 21:03:25 2022, Koji, Update, General, Scheduled power outage recovery
|
|
Message ID: 16667
Entry time: Fri Feb 11 16:09:11 2022
In reply to: 16657
Reply to this: 16669
|
Author: |
Anchal |
Type: |
Update |
Category: |
General |
Subject: |
Scheduled power outage recovery - Input power increased |
|
|
We increased the input power to IMC by replacing the 98% transmission BS by a 10% transmission BS on the detection table (reverse of what mentioned in 40m/16408 see attachment 8-9 ). We then realigned the BS so that MC RFPD is centered. Then we realigned two steering mirrors to get the beam centered on the WFS1 and WFS2 QPD. Then we increased the power of the input beam to get 5.307 reading on the C1:IOO-MC_RFPD_DCMON channel. We did this so that we can align the IMC. Once we have it aligned, we'll go back to low poer for doing chamber work.
Beware, there is about 1W beam on the detection table right now.
|