[paco, ]
We went over the X end to check what was going on with the TRX signal. We spotted the ground terminal coming from the QPD is loosely touching the handle of one of the computers on the rack. When we detached it completely from the rack the noise was gone (attachment 1).
We taped this terminal so it doesn't touch anything accidently. We don't know if this is the best solution since it is probably needs a stable voltage reference. In the Y end those ground terminals are connected to the same point on the rack. The other ground terminals in the X end are just cut.
We also took the PSD of these channels (attachment 2). The noise seem to be gone but TRX is still a bit noisier than TRY. Maybe we should setup a proper ground for the X arm QPD?
We saw that the X end station ALS laser was off. We turned it on and also the crystal oven and reenabled the temperature controller. Green light immidiately appeared. We are now working to restore the ALS lock. After running XARM ASS we were unable to lock the green laser so we went to the XEND and moved the piezo X ALS alignment mirrors until we maximized the transmission in the right mode. We then locked the ALS beams on both arms successfully. It very well could be that the PZT offsets were reset by the power glitch. The XARM ALS still needs some tweaking, its level is ~ 25% of what it was before the power glitch. |