40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Tue Feb 2 17:09:17 2021, yehonathan, Update, BHD, SOS assembly 20210202_165501.jpg20210202_162452.jpg
    Reply  Tue Feb 2 18:24:54 2021, Koji, Update, BHD, SOS assembly 
       Reply  Thu Feb 4 15:14:55 2021, Yehonathan, Update, BHD, SOS assembly 20210204_144007.jpg
          Reply  Tue Feb 16 13:13:39 2021, Yehonathan, Update, BHD, SOS assembly 
             Reply  Tue Feb 16 15:29:01 2021, Koji, Update, BHD, SOS assembly 
                Reply  Tue Feb 16 22:59:36 2021, Yehonathan, Update, BHD, SOS assembly 
                   Reply  Fri Feb 19 12:21:04 2021, Yehonathan, Update, BHD, SOS assembly 
                      Reply  Fri Mar 26 10:25:37 2021, Yehonathan, Update, BHD, SOS assembly 
                         Reply  Tue Apr 6 15:42:57 2021, Yehonathan, Update, BHD, SOS assembly 20210406_150724.png
                            Reply  Fri Apr 9 20:54:54 2021, Yehonathan, Update, BHD, SOS assembly 20210409_202717.jpg20210409_202755.jpg
                               Reply  Mon Apr 12 17:30:11 2021, Yehonathan, Update, BHD, SOS assembly 20210412_170913.jpg
                                  Reply  Mon May 3 16:49:04 2021, Yehonathan, Update, BHD, SOS assembly 20210503_161422.png20210503_161456.jpg
                                     Reply  Tue Jun 1 16:17:06 2021, Yehonathan, Update, BHD, SOS assembly 
                                        Reply  Wed Jun 2 01:03:19 2021, Koji, Update, BHD, SOS assembly 
                                           Reply  Fri Jun 18 19:02:00 2021, Yehonathan, Update, BHD, SOS assembly 20210618_115017.jpgUntitled_2.png20210618_160041_HDR.jpg
                                              Reply  Fri Jun 18 23:53:08 2021, Koji, Update, BHD, SOS assembly 
                                                 Reply  Tue Jun 22 17:05:26 2021, Yehonathan, Update, BHD, SOS assembly 
                                                    Reply  Tue Jul 27 17:14:18 2021, Yehonathan, Update, BHD, SOS assembly 20210727_154506.png
                                                       Reply  Tue Jul 27 20:12:53 2021, Koji, Update, BHD, SOS assembly 
                                              Reply  Mon Jun 28 12:35:19 2021, Yehonathan, Update, BHD, SOS assembly toomuchglue1.pngtoomuchglue2.pngdirtydumbell.pngcleandumbell.pngassembly_on_metalbracket.png
                                                 Reply  Tue Jun 29 20:45:52 2021, Yehonathan, Update, BHD, SOS assembly 20210629_135736.jpg20210629_135746.jpg
                                                    Reply  Thu Jul 1 16:45:25 2021, Yehonathan, Update, BHD, SOS assembly 
                                                       Reply  Wed Jul 28 12:00:35 2021, Yehonathan, Update, BHD, SOS assembly 
                                                          Reply  Thu Sep 23 18:18:07 2021, Yehonathan, Update, BHD, SOS assembly dumbell_before.pngdumbell_after.png
                                                             Reply  Tue Oct 26 10:17:14 2021, Yehonathan, Update, BHD, SOS assembly 
                                                                Reply  Thu Oct 28 23:13:19 2021, Yehonathan, Update, BHD, SOS assembly OpLev_Setup.jpgsuspended_optic.png20211029_113011.jpg20211029_113052.jpg
                                                                   Reply  Tue Nov 2 15:02:03 2021, Yehonathan, Update, BHD, SOS assembly FreeSwingingSpectra.pdf
                                                                      Reply  Tue Nov 2 22:50:30 2021, Koji, Update, BHD, SOS assembly 
                                                                         Reply  Mon Nov 8 17:22:27 2021, Yehonathan, Update, BHD, SOS assembly Magnets_Positions.pngAdapters_Order.png
                                                                            Reply  Tue Nov 9 11:11:37 2021, Yehonathan, Update, BHD, SOS assembly 20211109_110408.jpg
                                                                               Reply  Fri Nov 12 23:47:29 2021, Yehonathan, Update, BHD, SOS assembly 
                                                                                  Reply  Tue Nov 16 17:42:46 2021, Yehonathan, Update, BHD, SOS assembly 20211115_170320_HDR.jpg20211116_163846.jpgmagnet_height_check(1).pngside_blcok_touching_1.pngside_blcok_touching_2.png
                                                                                     Reply  Tue Nov 16 18:28:53 2021, Koji, Update, BHD, SOS assembly D2100546_Wire_Block.pdfD2100546_Wire_Block.png
                                                                                        Reply  Wed Nov 24 14:15:15 2021, Yehonathan, Update, BHD, SOS assembly 
                                                                                           Reply  Wed Dec 1 12:57:08 2021, Yehonathan, Update, BHD, SOS assembly 7x
Message ID: 16215     Entry time: Fri Jun 18 19:02:00 2021     In reply to: 16172     Reply to this: 16216   16227
Author: Yehonathan 
Type: Update 
Category: BHD 
Subject: SOS assembly 

Today I glued some magnets to dumbells.

First, I took 6 magnets (the maximum I can glue in one go) and divided them into 3 north and 3 south. Each triplet on a different razor (attachment 1).

I put the gluing fixture I found on top of these magnets so that each of the magnets sits in a hole in the fixture. I close the fixture but not all the way so that the dumbells get in easily (attachment 2).

I prepared EP-30 glue according to this dcc. I tested the mixture by putting some of it in the small toaster oven in the cleanroom for 15min at 200 degrees F.

The first two batches came out sticky and soft. I discarded the glue cartridge and opened a new one. The oven test results with the new cartridge were much better: smooth and hard surface. I picked up some glue with a needle and applied it to the surface of 6 dumbells I prepared in advance. I dropped the dumbells with the glue facing down into the magnet holes in the fixtures (attachment 3). I tightened the fixture and put some weight on it. I let it cure over the weekend.

I also pushed cut Viton tips that Jordan cleaned into the vented screws. While screwing small EQ stops into the lower clamps I found some problems. 4 of the lower clamps need rethreading. This is quite urgent because without those 4 clamps we don't have enough SOS towers. Moreover, I found that the screws that we bought from UC components to hold the lower clamps on the SOS towers were silver plated. This is a mistake in the SOS schematics (part 23) - they should be SS.

Attachment 1: 20210618_115017.jpg  215 kB  Uploaded Fri Jun 18 20:10:13 2021  | Hide | Hide all
20210618_115017.jpg
Attachment 2: Untitled_2.png  276 kB  Uploaded Fri Jun 18 20:14:08 2021  | Hide | Hide all
Untitled_2.png
Attachment 3: 20210618_160041_HDR.jpg  255 kB  Uploaded Fri Jun 18 20:21:25 2021  | Hide | Hide all
20210618_160041_HDR.jpg
ELOG V3.1.3-