Mr Fred Goodbar of Konacrane was in the lab 830am-1130am today. All three cranes in the VEA were inspected, loaded with 450lb test weights, and declared in good working condition and safe to use.
- Apparently, the clackity noise heard when running the crane at the south end is a known problem - the crane was opened up and inspected sometime in the past, and no obvious cause was found. This is not expected to affect the usability of the crane.
- The travel speed of the cranes is slow - but this is apparently intentional, on the request of Steve V.
The interferometer subsystems appear normal after the inspection. |