Entry  Thu Jul 23 15:58:24 2020, Jon, Summary, VAC, Vacuum controls refurbishment plan 
    Reply  Mon Jul 27 15:48:36 2020, Jon, Summary, VAC, Vacuum parts ordered 
Message ID: 15499     Entry time: Thu Jul 23 15:58:24 2020     Reply to this: 15501
Author: Jon 
Type: Summary 
Category: VAC 
Subject: Vacuum controls refurbishment plan 

This year we've struggled with vacuum controls unreliability (e.g., spurious interlock triggers) caused by decaying hardware. Here are details of the vacuum refurbishment plan I described on the 40m call this week.

 Refurbish TP2 and TP3 dry pumps. Completed [ELOG 15417].

 Automated notifications of interlock-trigger events. Email to 40m list and a new interlock flag channel. Completed [ELOG 15424].

Replace failing UPS.

  • Two new Tripp Lite units on order, 110V and 230V [ELOG 15465].
  • Jordan will install them in the vacuum rack once received.
  • Once installed, Jon will come test the new units, set up communications, and integrate them into the interlock system following this plan [ELOG 15446].
  • Jon will move the pumps and other equipment to the new UPS units only after completing the above step.

Remove interlock dependencies on TP2/TP3 serial readbacks. Due to persistent glitching [ELOG 15140, ELOG 15392].

Unlike TP2 and TP3, the TP1 readbacks are real analog signals routed to Acromags. As these have caused us no issues at all, the plan is to eliminate dependence on the TP2/3 digital readbacks in favor of the analog controller outputs. All the digital readback channels will continue to exist, but the interlock system will no longer depend on them. This will require adding 2 new sinking BI channels each for TP2 and TP3 (for a total of 4 new channels). We have 8 open Acromag XT1111 channels in the c1vac system [ELOG 14493], so the new channels can be accommodated. The below table summarizes the proposed changes.

Channel Type Status Description Interlock
C1:Vac-TP1_current AI exists Current draw (A) keep
C1:Vac-TP1_fail BI exists Critical fault has occurred keep
C1:Vac-TP1_norm BI exists Rotation speed is within +/-10% of set point new
C1:Vac-TP2_rot soft exists Rotation speed (krpm) remove
C1:Vac-TP2_temp soft exists Temperature (C) remove
C1:Vac-TP2_current soft exists Current draw (A) remove
C1:Vac-TP2_fail BI new Critical fault has occurred new
C1:Vac-TP2_norm BI new Rotation speed is >80% of set point new
C1:Vac-TP3_rot soft exists Rotation speed (krpm) remove
C1:Vac-TP3_temp soft exists Temperature (C) remove
C1:Vac-TP3_current soft exists Current draw (A) remove
C1:Vac-TP3_fail BI new Critical fault has occurred new
C1:Vac-TP3_norm BI new Rotation speed is >80% of set point new