40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Thu Jul 9 17:12:52 2020, gautam, Update, BHD, In-air BHD 
|
Tue Jul 14 15:29:25 2020, gautam, Update, BHD, In-air BHD - DCPD amplifier noise
|
Wed Jul 15 19:11:40 2020, gautam, Update, BHD, In-air BHD - alignment into OMC
|
Thu Jul 16 01:12:22 2020, gautam, Update, BHD, In-air BHD - preparing the LO path   
|
Sun Jul 19 15:40:15 2020, gautam, Update, BHD, In-air BHD - CDS and wiring summary
|
Wed Jul 29 11:57:59 2020, rana, Update, BHD, In-air BHD - CDS and wiring summary
|
Mon Jul 20 17:55:15 2020, gautam, Update, BHD, In-air BHD - preparing the LO path
|
Tue Jul 21 00:30:24 2020, gautam, Update, BHD, In-air BHD - LO RIN
|
|
Message ID: 15495
Entry time: Mon Jul 20 17:55:15 2020
In reply to: 15489
Reply to this: 15497
|
Author: |
gautam |
Type: |
Update |
Category: |
BHD |
Subject: |
In-air BHD - preparing the LO path |
|
|
The LO pickoff has been coupled into a fiber with ~90% MM (8 mW / 9 mW input). While I wait for the DCPD electronics to be found in the Cryo lab, I want to monitor the stability of the pointing, polarization etc, so I'd like to clear some space on the AP table that was occupied for the mode spectroscopy project. If there are no objections before 2pm tomorrow July 21 2020, I will commence this work. |