40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Mon Jan 6 15:36:55 2020, Jon, Update, PSL, Assembly underway for c1psl upgrade 
    Reply  Mon Jan 6 16:07:12 2020, gautam, Update, PSL, Assembly underway for c1psl upgrade 
       Reply  Mon Jan 6 19:05:09 2020, not gautam, Update, PSL, Assembly underway for c1psl upgrade 
    Reply  Fri Jan 10 19:48:46 2020, yehonathan, Update, PSL, Assembly underway for c1psl upgrade 20200110_194429.jpg20200110_194516_HDR.jpg
       Reply  Mon Jan 13 16:05:18 2020, yehonathan, Update, PSL, Assembly underway for c1psl upgrade 
          Reply  Tue Jan 14 17:16:43 2020, yehonathan, Update, PSL, Assembly underway for c1psl upgrade 
             Reply  Wed Jan 15 10:12:46 2020, gautam, Update, PSL, Assembly underway for c1psl upgrade 
                Reply  Wed Jan 15 16:08:40 2020, not gautam, Update, PSL, Assembly underway for c1psl upgrade 
Message ID: 15116     Entry time: Fri Jan 10 19:48:46 2020     In reply to: 15111     Reply to this: 15118
Author: yehonathan 
Type: Update 
Category: PSL 
Subject: Assembly underway for c1psl upgrade 

{Yehonathan, Jon}

I finished pre-wiring the PSL chassis. I mounted the Acromags on the DIN rails and labeled them. I checked that they are powered up with the right voltage +24V and that the LEDs behave as expected.

Attachment 1: 20200110_194429.jpg  1.129 MB  | Hide | Hide all
20200110_194429.jpg
Attachment 2: 20200110_194516_HDR.jpg  1.475 MB  | Hide | Hide all
20200110_194516_HDR.jpg
ELOG V3.1.3-