40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Thu Oct 3 12:08:47 2019, gautam, Update, General, Make the Jenne-laser setup fiber-coupled 
|
Thu Oct 3 14:32:37 2019, rana, Update, General, Make the Jenne-laser setup fiber-coupled
|
Thu Oct 3 14:54:33 2019, Koji, Update, General, Make the Jenne-laser setup fiber-coupled
|
Thu Oct 3 21:05:04 2019, aaron, Update, General, Make the Jenne-laser setup fiber-coupled
|
Thu Oct 3 23:15:39 2019, Koji, Update, General, Make the Jenne-laser setup fiber-coupled
|
Fri Oct 4 00:30:31 2019, gautam, Update, General, Make the Jenne-laser setup fiber-coupled
|
Fri Oct 4 14:25:59 2019, aaron, Update, General, Make the Jenne-laser setup fiber-coupled  
|
|
Message ID: 14937
Entry time: Fri Oct 4 00:30:31 2019
In reply to: 14934
Reply to this: 14940
|
Author: |
gautam |
Type: |
Update |
Category: |
General |
Subject: |
Make the Jenne-laser setup fiber-coupled |
|
|
I think the metric of interest here is the consistency of the AC transimpedance of the proposed new "Reference PD" (= fiber coupled NF1611) vs the old reference (free space NF1611), since everything will be calibrated against that.
Quote: |
Something still looks very wrong -- the PD is supposed to be flat out to 1GHz, and physical units pending, need food.
|
|