40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 14817     Entry time: Tue Jul 30 09:13:31 2019
Author: gautam 
Type: Update 
Category: PSL 
Subject: c1psl keyed, Agilent setup cleared 
  1. IMC would not lock. c1psl EPICS channels were unresponsive. I keyed the crate and went through the usual burtrestore/PMC-relocking dance.
  2. While at 1X2, I decided to take this opportunity to clean up the AG4395 setup that has been setup there unused for several weeks now.
    • Unplugged the active probe connected via BNC-T connector to the mixer IF output.
    • Noticed that the active probe (S/N 2850J01450) did not have it's power connection connected. According to the manual, this is bad. I don't know if the probe is damaged or not.
    • Moved the AG4395 cart out of the way so that there is a little more room around 1X1/1X2.
ELOG V3.1.3-