40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Feb 20 23:55:51 2019, gautam, Update, ALS, ALS delay line electronics delayLineDemod.pdf.zip
    Reply  Thu Mar 7 01:06:38 2019, gautam, Update, ALS, ALS delay line electronics 
       Reply  Tue Mar 12 22:51:25 2019, gautam, Update, ALS, ALS delay line electronics 
       Reply  Wed Mar 13 01:27:30 2019, gautam, Update, ALS, ALS delay line electronics DFDcal.pdfDFDnoise.pdf
          Reply  Sun Mar 17 00:42:20 2019, gautam, Update, ALS, NF1611 cannot be shot-noise limited? PDnoise.pdf
             Reply  Thu Mar 28 19:40:02 2019, gautam, Update, ALS, BeatMouth with NF1611s assembled IMG_7381.JPGIMG_7382.JPGrelTF_schem.pdfdarkNoise.pdf
                Reply  Fri Mar 29 21:00:06 2019, gautam, Update, ALS, BeatMouth with NF1611s installed IMG_7384.JPGIMG_7385.JPG
                   Reply  Sun Mar 31 15:05:53 2019, gautam, Update, ALS, Fiber beam-splitters not PM IMG_7384.JPG
                      Reply  Wed Apr 3 09:04:01 2019, gautam, Update, ALS, Note about new fiber couplers 
                         Reply  Wed Apr 3 12:32:33 2019, Koji, Update, ALS, Note about new fiber couplers 
                      Reply  Fri Apr 5 00:33:58 2019, gautam, Update, ALS, Promising IR ALS noise IMG_7388.JPGfreeSpace_IR_beat.pdf
                         Reply  Fri Apr 5 11:49:30 2019, gautam, Update, ALS, PSL + X green beat recovery 
                         Reply  Mon Apr 8 00:04:08 2019, gautam, Update, ALS, IR ALS noise budget DFDnoise.pdf
                            Reply  Mon Apr 8 18:28:25 2019, gautam, Update, ALS, EX Green PDH checkout IMG_7393.JPGgreenModeMatch.pdf
                               Reply  Mon Apr 8 23:52:09 2019, gautam, Update, ALS, EX Green PDH error monitor calibrated errMonCalib.pdferrMon.pngOLTF.pdfEX_frequencyNoises.pdf
                                  Reply  Tue Apr 9 00:16:22 2019, rana, Update, ALS, EX Green PDH error monitor calibrated 
                                     Reply  Tue Apr 9 00:18:19 2019, gautam, Update, ALS, EX Green PDH error monitor calibrated 
                                  Reply  Tue Apr 9 18:44:00 2019, gautam, Update, ALS, EX Green PDH discriminant measurement cavityFlashes.pdfmodelPDH.pdf
                            Reply  Tue Apr 9 19:07:12 2019, gautam, Update, ALS, IR ALS noise budget ALS_noiseBudget.pdfALS_noiseBudget.pdf
                               Reply  Thu Apr 11 01:10:05 2019, gautam, Update, ALS, Large 2kHz peak (and harmonics) in ALS X EX_PDH_2kNoise.pdf
                                  Reply  Wed Apr 17 00:50:17 2019, gautam, Update, ALS, Large 2kHz peak (and harmonics) in ALS X no more EX_PDHnoise.pdf
                                     Reply  Wed Apr 17 11:01:49 2019, gautam, Update, ALS, Large 2kHz peak (and harmonics) in ALS X no more EX_PDH_specGram.pdf
                      Reply  Wed May 29 18:13:25 2019, gautam, Update, ALS, Fiber beam-splitters are now PM 
                         Reply  Fri May 31 15:55:16 2019, gautam, Update, ALS, PSL + X beat restored 
Message ID: 14528     Entry time: Tue Apr 9 19:07:12 2019     In reply to: 14521     Reply to this: 14533
Author: gautam 
Type: Update 
Category: ALS 
Subject: IR ALS noise budget 

Updated the noise budget to include the unsuppressed frequency noise from the EX laser. It does not explain the noise between 10-100 Hz, although the 1-3 Hz noise is close.

Actually, I think the curve that should go on the budget is when the X arm length is locked to the PSL frequency, whereas this is when the X arm is just locally damped. I will update it later tonight.

Update 1010pm: I've uploaded the relevant plot as Attachment #2. Predictably, the unsuppressed frequency noise of the EX laser is now higher, because the MC length is a noisier frequency reference than the arm cavity. But still it is a factor of 10 below the measured ALS noise.

Quote:

Next noises to budget:

  1. In-loop X arm length noise
  2. In-lop EX laser frequency noise
Attachment 1: ALS_noiseBudget.pdf  108 kB  Uploaded Tue Apr 9 20:08:34 2019  | Hide | Hide all
ALS_noiseBudget.pdf
Attachment 2: ALS_noiseBudget.pdf  110 kB  Uploaded Tue Apr 9 23:13:35 2019  | Hide | Hide all
ALS_noiseBudget.pdf
ELOG V3.1.3-