Thu Dec 20 21:29:41 2018, Jon, Omnistructure, Upgrade, Vacuum Controls Switchover Completed
|
Fri Dec 21 11:13:13 2018, gautam, Omnistructure, VAC, N2 line valved off 
|
Fri Dec 21 12:57:10 2018, Koji, Omnistructure, VAC, N2 line valved off
|
Thu Jan 3 15:08:37 2019, gautam, Omnistructure, VAC, Vac status unknown  
|
Fri Jan 4 17:43:24 2019, gautam, Update, CDS, Timing issues
|
Wed Jan 9 11:33:35 2019, gautam, Update, CDS, Timing issues still persist 
|
Fri Jan 4 10:25:19 2019, Jon, Omnistructure, VAC, N2 line valved off
|
Thu Mar 21 18:36:59 2019, Jon, Omnistructure, Upgrade, Vacuum Controls Switchover Completed
|
|
Message ID: 14493
Entry time: Thu Mar 21 18:36:59 2019
In reply to: 14375
|
Author: |
Jon |
Type: |
Omnistructure |
Category: |
Upgrade |
Subject: |
Vacuum Controls Switchover Completed |
|
|
Updated vac channel list is attached. There are several new ADC channels.
Quote: |
Hardware & Channel Assignments
All of the new hardware is now permanently installed in the vacuum rack. This includes the SuperMicro rack server (c1vac), the IOLAN serial device server, a vacuum subnet switch, and the Acromag chassis. Every valve/pump signal cable that formerly connected to the VME bus through terminal blocks has been refitted with a D-sub connector and screwed directly onto feedthroughs on the Acromag chassis.
The attached pdf contains the master list of assigned Acromag channels and their wiring.
|
|
|
|