Fri Sep 21 09:59:09 2018, yuki, Configuration, ASC, Y end table upgrade plan    
|
Sun Sep 23 19:32:23 2018, yuki, Configuration, ASC, Y end table upgrade plan    
|
Mon Sep 24 11:09:05 2018, yuki, Configuration, ASC, Y end table upgrade plan
|
Tue Sep 25 18:08:50 2018, yuki, Configuration, ASC, Y end table upgrade plan
|
Thu Sep 27 14:02:55 2018, yuki, Configuration, ASC, PZT driver board verification    
|
Sun Sep 30 20:14:51 2018, yuki, Configuration, ASC, QPD calibration 
|
Mon Oct 1 12:03:41 2018, not yuki, Configuration, ASC, PZT driver board verification
|
Mon Oct 1 13:33:55 2018, yuki, Configuration, ASC, QPD calibration
|
Tue Oct 2 18:50:53 2018, yuki, Configuration, ASC, PZT mirror calibration   
|
Wed Oct 3 18:15:34 2018, yuki, Configuration, ASC, AI board improvement
|
Thu Oct 4 00:44:50 2018, yuki, Configuration, ASC, AI board improvement
|
Thu Oct 4 22:15:30 2018, yuki, Configuration, ASC, Y-end table upgrade  
|
Fri Oct 5 00:46:17 2018, Koji, Configuration, ASC, Y-end table upgrade
|
Fri Oct 5 17:32:38 2018, yuki, Configuration, ASC, Y-end table upgrade
|
Mon Oct 8 00:46:35 2018, yuki, Configuration, ASC, Y-end table upgrade
|
Fri Oct 5 17:47:55 2018, gautam, Configuration, ASC, Y-end table upgrade
|
Fri Oct 5 22:49:22 2018, yuki, Configuration, ASC, Y-end table upgrade
|
Sun Oct 7 16:51:03 2018, gautam, Configuration, LSC, Yarm triggering changed
|
Sun Oct 7 22:30:42 2018, yuki, Configuration, LSC, Yarm Green locking was recovered 
|
Tue Oct 9 23:03:43 2018, yuki, Configuration, LSC, Yarm Green locking was recovered 
|
Wed Oct 10 12:38:27 2018, yuki, Configuration, LSC, All hardware was installed
|
Mon Oct 1 20:39:09 2018, gautam, Configuration, ASC, c1asy
|
Mon Oct 8 18:56:52 2018, gautam, Configuration, ASC, c1asx filter coefficient file missing
|
Tue Oct 9 16:05:29 2018, gautam, Configuration, ASC, c1tst deleted, c1asy deployed.
|
Wed Oct 3 14:24:40 2018, yuki, Configuration, ASC, Y end table upgrade plan
|
Mon Oct 15 20:11:56 2018, yuki, Configuration, ASC, Y end table upgrade plan
|
Wed Oct 17 20:46:24 2018, yuki, Configuration, ASC, Y end table upgrade plan
|
|
Message ID: 14257
Entry time: Mon Oct 15 20:11:56 2018
In reply to: 14226
Reply to this: 14260
|
Author: |
yuki |
Type: |
Configuration |
Category: |
ASC |
Subject: |
Y end table upgrade plan |
|
|
Final Procedure Report for Green Locking in YARM:
Purpose
The current setup of AUX Y-arm Green locking has to be improved because:
- current efficiency of mode matching is about 50%
- current setup doesn't separate the degrees of freedom of TEM01 with PZT mirrors (the difference of gouy phase between PZT mirrors should be around 90 deg)
- we want to remotely control PZT mirrors for alignment
What to do
- Design the new setup and order optices needed (finished!)
- As the new setup I designed, adding a new lens and slightly changing the position of optics are only needed. The new lens was arrived here.
- Check electronics (PZT, PZT driver, high voltage, cable, anti-imaging board) (finished!)
- All electronics were made sure performing well.
- The left thing to do is making a cable. (Today's tasks)
- Calibrate PZT mirror [mrad/V] (finished!)
- The result was posted here --> elog:40m/14224.
- Measure the status value of the current setup (power of transmitted light ...etc) (finished!)
- Install them in the Y-end table and align the beam (Almost finished!) (GTRY signal is 0.3 which means Mode-Matching efficiency is about 30%. It should be improved.)
- Measure the status value of the new setup (finished!)
- Prepare the code of making alignment automaticaly
- see sitemap.adl>ASC>c1asy. I prepared medm. If you move PZT SLIDERS then you can see the green beam also moves.
- Preparing filters is needed. You can copy them from C1ASX.
- Note that now you cannot use C1ASX servo because filters are not applied.
|