Fri Sep 21 09:59:09 2018, yuki, Configuration, ASC, Y end table upgrade plan    
|
Sun Sep 23 19:32:23 2018, yuki, Configuration, ASC, Y end table upgrade plan    
|
Mon Sep 24 11:09:05 2018, yuki, Configuration, ASC, Y end table upgrade plan
|
Tue Sep 25 18:08:50 2018, yuki, Configuration, ASC, Y end table upgrade plan
|
Thu Sep 27 14:02:55 2018, yuki, Configuration, ASC, PZT driver board verification    
|
Sun Sep 30 20:14:51 2018, yuki, Configuration, ASC, QPD calibration 
|
Mon Oct 1 12:03:41 2018, not yuki, Configuration, ASC, PZT driver board verification
|
Mon Oct 1 13:33:55 2018, yuki, Configuration, ASC, QPD calibration
|
Tue Oct 2 18:50:53 2018, yuki, Configuration, ASC, PZT mirror calibration   
|
Wed Oct 3 18:15:34 2018, yuki, Configuration, ASC, AI board improvement
|
Thu Oct 4 00:44:50 2018, yuki, Configuration, ASC, AI board improvement
|
Thu Oct 4 22:15:30 2018, yuki, Configuration, ASC, Y-end table upgrade  
|
Fri Oct 5 00:46:17 2018, Koji, Configuration, ASC, Y-end table upgrade
|
Fri Oct 5 17:32:38 2018, yuki, Configuration, ASC, Y-end table upgrade
|
Mon Oct 8 00:46:35 2018, yuki, Configuration, ASC, Y-end table upgrade
|
Fri Oct 5 17:47:55 2018, gautam, Configuration, ASC, Y-end table upgrade
|
Fri Oct 5 22:49:22 2018, yuki, Configuration, ASC, Y-end table upgrade
|
Sun Oct 7 16:51:03 2018, gautam, Configuration, LSC, Yarm triggering changed
|
Sun Oct 7 22:30:42 2018, yuki, Configuration, LSC, Yarm Green locking was recovered 
|
Tue Oct 9 23:03:43 2018, yuki, Configuration, LSC, Yarm Green locking was recovered 
|
Wed Oct 10 12:38:27 2018, yuki, Configuration, LSC, All hardware was installed
|
Mon Oct 1 20:39:09 2018, gautam, Configuration, ASC, c1asy
|
Mon Oct 8 18:56:52 2018, gautam, Configuration, ASC, c1asx filter coefficient file missing
|
Tue Oct 9 16:05:29 2018, gautam, Configuration, ASC, c1tst deleted, c1asy deployed.
|
Wed Oct 3 14:24:40 2018, yuki, Configuration, ASC, Y end table upgrade plan
|
Mon Oct 15 20:11:56 2018, yuki, Configuration, ASC, Y end table upgrade plan
|
Wed Oct 17 20:46:24 2018, yuki, Configuration, ASC, Y end table upgrade plan
|
|
Message ID: 14235
Entry time: Sun Oct 7 16:51:03 2018
In reply to: 14234
Reply to this: 14236
|
Author: |
gautam |
Type: |
Configuration |
Category: |
LSC |
Subject: |
Yarm triggering changed |
|
|
To facilitate Yuki's alignment of the EY green beam into the Yarm cavity, I have changed the LSC triggering and PowNorm settings to use only the reflected light from the cavity to do the locking of Arm Cavity length to PSL. Running the configure script should restore the usual TRY triggering settings. Also, the X arm optics were macroscopically misaligned in order to be able to lock in this configuration. |