40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Fri Sep 21 09:59:09 2018, yuki, Configuration, ASC, Y end table upgrade plan    
|
Sun Sep 23 19:32:23 2018, yuki, Configuration, ASC, Y end table upgrade plan    
|
Mon Sep 24 11:09:05 2018, yuki, Configuration, ASC, Y end table upgrade plan
|
Tue Sep 25 18:08:50 2018, yuki, Configuration, ASC, Y end table upgrade plan
|
Thu Sep 27 14:02:55 2018, yuki, Configuration, ASC, PZT driver board verification    
|
Sun Sep 30 20:14:51 2018, yuki, Configuration, ASC, QPD calibration 
|
Mon Oct 1 12:03:41 2018, not yuki, Configuration, ASC, PZT driver board verification
|
Mon Oct 1 13:33:55 2018, yuki, Configuration, ASC, QPD calibration
|
Tue Oct 2 18:50:53 2018, yuki, Configuration, ASC, PZT mirror calibration   
|
Wed Oct 3 18:15:34 2018, yuki, Configuration, ASC, AI board improvement
|
Thu Oct 4 00:44:50 2018, yuki, Configuration, ASC, AI board improvement
|
Thu Oct 4 22:15:30 2018, yuki, Configuration, ASC, Y-end table upgrade  
|
Fri Oct 5 00:46:17 2018, Koji, Configuration, ASC, Y-end table upgrade
|
Fri Oct 5 17:32:38 2018, yuki, Configuration, ASC, Y-end table upgrade
|
Mon Oct 8 00:46:35 2018, yuki, Configuration, ASC, Y-end table upgrade
|
Fri Oct 5 17:47:55 2018, gautam, Configuration, ASC, Y-end table upgrade
|
Fri Oct 5 22:49:22 2018, yuki, Configuration, ASC, Y-end table upgrade
|
Sun Oct 7 16:51:03 2018, gautam, Configuration, LSC, Yarm triggering changed
|
Sun Oct 7 22:30:42 2018, yuki, Configuration, LSC, Yarm Green locking was recovered 
|
Tue Oct 9 23:03:43 2018, yuki, Configuration, LSC, Yarm Green locking was recovered 
|
Wed Oct 10 12:38:27 2018, yuki, Configuration, LSC, All hardware was installed
|
Mon Oct 1 20:39:09 2018, gautam, Configuration, ASC, c1asy
|
Mon Oct 8 18:56:52 2018, gautam, Configuration, ASC, c1asx filter coefficient file missing
|
Tue Oct 9 16:05:29 2018, gautam, Configuration, ASC, c1tst deleted, c1asy deployed.
|
Wed Oct 3 14:24:40 2018, yuki, Configuration, ASC, Y end table upgrade plan
|
Mon Oct 15 20:11:56 2018, yuki, Configuration, ASC, Y end table upgrade plan
|
Wed Oct 17 20:46:24 2018, yuki, Configuration, ASC, Y end table upgrade plan
|
|
Message ID: 14232
Entry time: Fri Oct 5 17:32:38 2018
In reply to: 14231
Reply to this: 14237
|
Author: |
yuki |
Type: |
Configuration |
Category: |
ASC |
Subject: |
Y-end table upgrade |
|
|
I measured it with the wrong setting of a powermeter. The correct ones are here:
- beam power going into doubling crystal (red12): 240 mW, 1064nm
- beam power transmitted dichroic mirror (Y5): 0.70 mW, 532nm
- beam power going into faraday isolator (green5): 0.58 mW, 532nm
- beam power going out from faraday isolator (green5): 0.54 mW, 532nm
- beam power going to ETMY: 0.37 mW, 532nm
- beam power of transmitted green light of Y-arm, which was measured by C1:ALS-TRY_OUT: 0.5 (see attachment #1)
The calculated conversion efficiency of SHG crystal is 1.2%W. |