40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Fri Sep 21 09:59:09 2018, yuki, Configuration, ASC, Y end table upgrade plan    
|
Sun Sep 23 19:32:23 2018, yuki, Configuration, ASC, Y end table upgrade plan    
|
Mon Sep 24 11:09:05 2018, yuki, Configuration, ASC, Y end table upgrade plan
|
Tue Sep 25 18:08:50 2018, yuki, Configuration, ASC, Y end table upgrade plan
|
Thu Sep 27 14:02:55 2018, yuki, Configuration, ASC, PZT driver board verification    
|
Sun Sep 30 20:14:51 2018, yuki, Configuration, ASC, QPD calibration 
|
Mon Oct 1 12:03:41 2018, not yuki, Configuration, ASC, PZT driver board verification
|
Mon Oct 1 13:33:55 2018, yuki, Configuration, ASC, QPD calibration
|
Tue Oct 2 18:50:53 2018, yuki, Configuration, ASC, PZT mirror calibration   
|
Wed Oct 3 18:15:34 2018, yuki, Configuration, ASC, AI board improvement
|
Thu Oct 4 00:44:50 2018, yuki, Configuration, ASC, AI board improvement
|
Thu Oct 4 22:15:30 2018, yuki, Configuration, ASC, Y-end table upgrade  
|
Fri Oct 5 00:46:17 2018, Koji, Configuration, ASC, Y-end table upgrade
|
Fri Oct 5 17:32:38 2018, yuki, Configuration, ASC, Y-end table upgrade
|
Mon Oct 8 00:46:35 2018, yuki, Configuration, ASC, Y-end table upgrade
|
Fri Oct 5 17:47:55 2018, gautam, Configuration, ASC, Y-end table upgrade
|
Fri Oct 5 22:49:22 2018, yuki, Configuration, ASC, Y-end table upgrade
|
Sun Oct 7 16:51:03 2018, gautam, Configuration, LSC, Yarm triggering changed
|
Sun Oct 7 22:30:42 2018, yuki, Configuration, LSC, Yarm Green locking was recovered 
|
Tue Oct 9 23:03:43 2018, yuki, Configuration, LSC, Yarm Green locking was recovered 
|
Wed Oct 10 12:38:27 2018, yuki, Configuration, LSC, All hardware was installed
|
Mon Oct 1 20:39:09 2018, gautam, Configuration, ASC, c1asy
|
Mon Oct 8 18:56:52 2018, gautam, Configuration, ASC, c1asx filter coefficient file missing
|
Tue Oct 9 16:05:29 2018, gautam, Configuration, ASC, c1tst deleted, c1asy deployed.
|
Wed Oct 3 14:24:40 2018, yuki, Configuration, ASC, Y end table upgrade plan
|
Mon Oct 15 20:11:56 2018, yuki, Configuration, ASC, Y end table upgrade plan
|
Wed Oct 17 20:46:24 2018, yuki, Configuration, ASC, Y end table upgrade plan
|
|
Message ID: 14221
Entry time: Mon Oct 1 13:33:55 2018
In reply to: 14220
Reply to this: 14224
|
Author: |
yuki |
Type: |
Configuration |
Category: |
ASC |
Subject: |
QPD calibration |
|
|
Quote: |
I assume this QPD set is a D1600079/D1600273 combo.
How much was the SUM output during the measurement? Also how much were the beam radii of this beam (from the error func fittings)?
Then the calibration [V/m] is going to be the linear/inv-linear function of the incident power and the beam radus.
You mean the linear range is +/-50mV (for a given beam), I guess.
|
- The SUM output was from -174 to -127 mV.
- The beam radii calculated from the error func fittings was 0.47 mm.
- Total optical path length measured by a ruler= 36 cm.
- Beam power measured at QPD was 2.96 mW. (There are some loss mechanism in the setup.)
Then the calibration factor of the QPD is
X axis: 584 * (POWER / 2.96mW) * (0.472mm / RADIUS) [mV/mm]
Y axis: 588 * (POWER / 2.96mW) * (0.472mm / RADIUS) [mV/mm]. |
|
|