40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Sun Aug 5 13:28:43 2018, gautam, Update, CDS, c1lsc flaky
|
Mon Aug 6 00:26:21 2018, gautam, Update, CDS, More CDS woes
|
Mon Aug 6 14:38:38 2018, gautam, Update, CDS, More CDS woes 
|
Mon Aug 6 19:49:09 2018, gautam, Update, CDS, More CDS woes
|
Tue Aug 7 11:30:46 2018, gautam, Update, CDS, More CDS woes
|
Tue Aug 7 22:28:23 2018, gautam, Update, CDS, More CDS woes
|
Wed Aug 8 23:03:42 2018, gautam, Update, CDS, c1lsc model started
|
Thu Aug 9 12:31:13 2018, gautam, Update, CDS, CDS status update
|
Wed Aug 15 21:27:47 2018, gautam, Update, CDS, CDS status update
|
Tue Sep 4 10:14:11 2018, gautam, Update, CDS, CDS status update
|
Wed Sep 5 10:59:23 2018, wgautam, Update, CDS, CDS status update
|
Thu Sep 6 14:21:26 2018, gautam, Update, CDS, ADC replacement in c1lsc expansion chassis
|
Fri Sep 7 12:35:14 2018, gautam, Update, CDS, ADC replacement in c1lsc expansion chassis
|
Mon Sep 10 12:44:48 2018, Jon, Update, CDS, ADC replacement in c1lsc expansion chassis
|
Thu Sep 20 11:29:04 2018, gautam, Update, CDS, New PCIe fiber housed 
|
Thu Sep 20 16:19:04 2018, gautam, Update, CDS, New PCIe fiber install postponed to tomorrow
|
Fri Sep 21 16:46:38 2018, gautam, Update, CDS, New PCIe fiber installed and routed 
|
|
Message ID: 14203
Entry time: Thu Sep 20 16:19:04 2018
In reply to: 14202
Reply to this: 14206
|
Author: |
gautam |
Type: |
Update |
Category: |
CDS |
Subject: |
New PCIe fiber install postponed to tomorrow |
|
|
[steve, gautam]
This didn't go as smoothly as planned. While there were no issues with the new fiber over the ~3 hours that I left it plugged in, I didn't realize the fiber has distinct ends for the "HOST" and "TARGET" (-5 points to me I guess). So while we had plugged in the ends correctly (by accident) for the pre-lunch test, while routing the fiber on the overhead cable tray, we switched the ends (because the "HOST" end of the cable is close to the reel and we felt it would be easier to do the routing the other way.
Anyway, we will fix this tomorrow. For now, the old fiber was re-connected, and the models are running. IMC is locked.
Quote: |
Pictures + more procedural details + proper routing of the protected fiber along cable trays after lunch. If this doesn't help the stability problem, we are out of ideas again, so fingers crossed...
|
|