Message ID: 14050     Entry time: Tue Jul 10 23:44:23 2018
Author: Annalisa 
Type: Configuration 
Category: Thermal Compensation 
Subject: Heater setup assembly 

[Annalisa, Koji]

Today both the heater and the reflector were delivered, and we set down the setup to make some first test.

The schematic is the usual: the rod heater (30mm long, 3.8 mm diameter) is set inside the elliptical reflector, as close as possible to the first focus. In the second focus we put the power meter in order to measure the radiated power. The broadband power meter wavelength calibration has been set at 4µm: indeed, the heater emits all over the spectrum with the Black Body radiation distribution, and the broadband power meter measures all of them, but only starting from 4µm they will be actually absorbed my the mirror, that's why that calibration was chosen.

We measured the cold resistance of the heater, and it was about 3.5 Ohm. The heater was powered with the BK precision DC power supply 1735, and we took measurements at different input current.

Current [A] Voltage [V] Measured radiated power [mW] Resistance [Ohm]
0.5 2.2 20 4.4
0.8 6 120 7.5
1 11 400 11
1.2 18 970 15

We also aimed at measuring the heater temperature at each step, but the Fluke thermal camera is sensitive up to 300°C and also the FLIR seems to have a very limited temperature range (150°C?). We thought about using a thermocouple, but we tested its response and it seems definitely too slow. 

Some pictures of the setup are shown in figures 1 and 6.

Then we put an absorbing screen in the suspension mount to see the heat pattern, in such a way to get an idea of the heat spot position and size on the ETMY. (figure 2)

The projected pattern is shown in figures 3-4-5

The optimal position of the heater which minimizes the heat beam spot seems when the heater inserted by 2/3 in the reflector (1/3 out). However, this is just a qualitative evaluation.

Finally, two more pictures showing the DB connector on the flange and the in-vacuum cables.

Some more considerations about in-vacuum cabling to come.

Steve: how are you going to protect the magnets ?

Attachment 1: IMG_1992.jpg  676 kB  Uploaded Wed Jul 11 00:50:57 2018  | Hide | Hide all
IMG_1992.jpg
Attachment 2: IMG_2002.jpg  796 kB  Uploaded Wed Jul 11 01:36:53 2018  | Hide | Hide all
IMG_2002.jpg
Attachment 3: IR20180710_0364a.png  537 kB  Uploaded Wed Jul 11 01:39:03 2018  | Hide | Hide all
IR20180710_0364a.png
Attachment 4: IR20180710_0368.png  562 kB  Uploaded Wed Jul 11 01:39:19 2018  | Hide | Hide all
IR20180710_0368.png
Attachment 5: IR20180710_0360.png  168 kB  Uploaded Wed Jul 11 01:39:51 2018  | Hide | Hide all
IR20180710_0360.png
Attachment 6: IMG_1993.jpg  493 kB  Uploaded Wed Jul 11 01:45:55 2018  | Hide | Hide all
IMG_1993.jpg
Attachment 7: IMG_5322.JPG  3.558 MB  Uploaded Wed Jul 11 01:49:07 2018  | Hide | Hide all
IMG_5322.JPG
Attachment 8: IMG_5321.JPG  5.393 MB  Uploaded Wed Jul 11 01:49:18 2018  | Hide | Hide all
IMG_5321.JPG
ELOG V3.1.3-