40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Wed Jan 17 23:36:12 2018, johannes, Configuration, General, AS port laser injection 
|
Wed Apr 18 22:46:23 2018, johannes, Configuration, General, AS port laser injection  
|
Thu Apr 19 01:04:00 2018, gautam, Configuration, General, AS port laser injection
|
Thu Apr 19 20:41:09 2018, Koji, Configuration, General, Aux Laser LD dying? (AS port laser injection) 
|
Tue Apr 24 08:36:47 2018, johannes, Configuration, General, Aux Laser LD dying? (AS port laser injection)
|
Thu May 3 10:40:43 2018, johannes, Configuration, General, AS port laser injection 
|
Thu May 3 12:10:12 2018, gautam, Configuration, General, AS port laser injection
|
Wed May 23 00:45:18 2018, johannes, Configuration, General, AS port laser injection
|
|
Message ID: 13811
Entry time: Thu May 3 12:10:12 2018
In reply to: 13810
|
Author: |
gautam |
Type: |
Configuration |
Category: |
General |
Subject: |
AS port laser injection |
|
|
I think we need AS55 for locking the configuration Jon suggested - AS55 I and Q were used to lock the SRMI previously, and so I'd like to start from those settings but perhaps there is a way to do this with AS110 I and Q as well.
Quote: |
What signals are needed for the Guoy phase measurement? Is AS 110 sufficient, or do we need AS55?
|
|