Thu Jan 4 12:46:27 2018, gautam, Update, ALS, Fiber ALS assay 
|
Thu Jan 11 14:22:40 2018, gautam, Update, ALS, Fiber ALS assay
|
Thu Jan 11 20:51:20 2018, gautam, Update, ALS, Fiber ALS assay
|
Tue Jan 16 21:50:53 2018, gautam, Update, ALS, Fiber ALS assay
|
Thu Jan 18 00:35:00 2018, gautam, Update, ALS, Fiber ALS assay 
|
Fri Jan 19 11:34:21 2018, gautam, Update, ALS, Fiber ALS assay
|
Fri Jan 19 23:04:11 2018, gautam, Update, ALS, Fiber ALS assay
|
Wed Jan 24 00:33:31 2018, gautam, Update, ALS, Fiber ALS assay
|
Wed Jan 24 10:45:14 2018, gautam, Update, ALS, Fiber ALS assay
|
Thu Jan 25 23:59:14 2018, gautam, Update, ALS, Fiber ALS assay
|
Fri Jan 26 20:03:09 2018, gautam, Update, ALS, Fiber ALS assay
|
Wed Jan 31 15:45:22 2018, gautam, Update, ALS, Fiber ALS assay
|
Wed Jan 31 16:29:42 2018, gautam, Update, ALS, Modulation depths 
|
Wed Jan 31 16:33:53 2018, gautam, Update, ALS, ALS electronics at LSC rack
|
Wed Jan 31 22:32:11 2018, gautam, Update, ALS, ALS signal chain + power budget 
|
Thu Feb 1 01:24:56 2018, gautam, Update, ALS, D0902745 revamp underway
|
Fri Feb 2 00:26:34 2018, gautam, Update, ALS, D0902745 revamp underway
|
Fri Feb 2 13:16:55 2018, gautam, Update, ALS, ALS signals whitening switching 
|
Mon Feb 5 14:11:01 2018, gautam, Update, ALS, Huge harmonics in ALS channels 
|
Mon Feb 5 22:57:28 2018, gautam, Update, ALS, Huge harmonics in ALS channels
|
Tue Feb 6 11:13:26 2018, gautam, Update, ALS, Possible source of ground loop identified
|
Tue Feb 6 22:55:51 2018, gautam, Update, ALS, Possible source of ground loop identified
|
Thu Feb 8 00:33:20 2018, gautam, Update, ALS, D990694 characterization / THD measurement plan
|
Thu Feb 8 01:27:16 2018, Koji, Update, ALS, D990694 characterization / THD measurement plan
|
Fri Feb 9 13:37:44 2018, gautam, Update, ALS, THD measurement trial
|
Thu Feb 8 12:00:09 2018, gautam, Update, ALS, D990694 is NOT differential receiving
|
Thu Feb 8 13:13:14 2018, gautam, Update, ALS, D990694 pulled out  
|
Thu Feb 8 18:10:36 2018, gautam, Update, ALS, D990694 pulled out
|
Wed Feb 7 15:51:15 2018, gautam, Update, ALS, D0902745 revamp complete
|
Fri Feb 16 01:34:40 2018, gautam, Update, ALS, D0902745 in-situ testing 
|
Tue Feb 20 23:08:27 2018, gautam, Update, ALS, D0902745 in-situ testing
|
Thu Feb 22 00:09:11 2018, gautam, Update, ALS, D0902745 in-situ testing  
|
Sun Feb 25 00:03:12 2018, gautam, Update, ALS, Daughter board prototyping    
|
Mon Feb 26 20:55:56 2018, rana, Update, ALS, Daughter board prototyping
|
Tue Feb 27 21:10:45 2018, gautam, Update, ALS, Daughter board testing  
|
Wed Feb 28 19:13:25 2018, gautam, Update, ALS, ADC test for differential receiving in c1lsc
|
Fri Mar 2 01:45:06 2018, gautam, Update, ALS, new look ALS electronics
|
Mon Mar 5 17:27:34 2018, gautam, Update, ALS, new look ALS electronics - characterization
|
Thu Mar 8 00:40:25 2018, gautam, Update, ALS, new look ALS electronics - characterization
|
Thu Mar 8 19:38:37 2018, gautam, Update, ALS, digital unwhitening of daughter board
|
Thu Mar 8 23:50:27 2018, gautam, Update, ALS, First look at new ALS electronics
|
Fri Mar 9 01:07:01 2018, gautam, Update, ALS, First look at new ALS electronics
|
Mon Mar 12 22:08:31 2018, gautam, Update, ALS, Noisy POX
|
Mon Mar 12 23:57:31 2018, gautam, Update, ALS, Noisy POX 
|
Mon Mar 19 15:02:29 2018, gautam, Update, ALS, Noisy MC sensing
|
Thu Feb 1 15:31:12 2018, gautam, Update, ALS, ALS signal chain + power budget
|
Wed Feb 7 10:16:26 2018, gautam, Update, ALS, ALS signal chain + power budget
|
Thu Jan 25 13:18:41 2018, gautam, Update, ALS, Fiber ALS assay
|
|
Message ID: 13661
Entry time: Wed Feb 28 19:13:25 2018
In reply to: 13658
|
Author: |
gautam |
Type: |
Update |
Category: |
ALS |
Subject: |
ADC test for differential receiving in c1lsc |
|
|
[koji, gautam]
we did a bunch of tests to figure out the feasibility of the plan I outlined last night. Bottom line is: we appear to have a working 64 channel ADC (but with differential receiving that means 32 channels). But we need an aLIGO ADC adaptor card (I'm not sure of the DCC number but I think it is D0902006). See attached screenshot where we managed to add an ADC block to the IOP model on c1lsc, and it recognizes the additional ADC. The firmware on the (newly installed) working card is much newer than that on the existing card inside the expansion chassis (see Attachment #1).
Details:
- Watchdogged all optics because we expected messing around with c1lsc to take down all the vertex FEs. Actually, only c1sus was killed, c1ioo survived.
- Closed PSL shutter. Shut down c1lsc FE machine.
- Started out by checking the functionality of the two ADC cards I found.
- Turns out the one Jamie and I removed from c1ioo ~6months ago is indeed broken in some way, as we couldn't get it to work.
- Took us a while to figure out that we require the adaptor board and a working ADC card to get the realtime model to run properly. A useful document in understanding the IO expansion chassis is this one.
- Another subtlety is that the ADC card we installed today (photo in previous elog) is somewhat different from the ones installed in c1sus and c1lsc expansion chassis. But a similar one is installed at the Y-end at least. Point is, this ADC card seems to need an external power supply via a 4-pin Molex connector to work properly.
- We borrowed an adapter card from c1iscey expansion chassis (after first shutting down the machine).
- It seems like a RED GPIO0 LED on these ADC cards isn't indicative of a fault.
- Added an ADC part from CDS_PARTS library. Added an ADC selector bus and an "MADC" block that sets up the 64k testpoints as well as the EPICS readbacks.
- We were able to see sensible numbers (i.e. ~0 since there is no input to the ADC) on these readback channels.
- To restore everything, we first shutdown c1lsc, then restored the adaptor card back to c1iscey, and then rebooted c1iscey, c1lsc and c1sus. Recompiled c1x04 with the added ADC block removed as it would otherwise complain due to the absence of an adapter board.
- Did rtcds restart <model> on all machines to bring back all models that were killed. This went smoothly.
- IMC and Yarm locked smooth.
Note that we have left the working ADC card inside the c1lsc expansion chassis. Plan is to give Rolf the faulty ADC card and at the same time ask him for a working adapter board.
Unrelated to this work: we have also scavenged 4 pcs of v2 of the differential receiving AA board from WB EE shop, along with a 1U chassis for the same. These are under my desk at the 40m for the moment. We will need to re-stuff these with appropriate OpAmps (and also maybe change some Rs and Cs) to make this board the same as v6, which is the version currently in use. |
|
|