40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Thu Jan 4 12:46:27 2018, gautam, Update, ALS, Fiber ALS assay 
|
Thu Jan 11 14:22:40 2018, gautam, Update, ALS, Fiber ALS assay
|
Thu Jan 11 20:51:20 2018, gautam, Update, ALS, Fiber ALS assay
|
Tue Jan 16 21:50:53 2018, gautam, Update, ALS, Fiber ALS assay
|
Thu Jan 18 00:35:00 2018, gautam, Update, ALS, Fiber ALS assay 
|
Fri Jan 19 11:34:21 2018, gautam, Update, ALS, Fiber ALS assay
|
Fri Jan 19 23:04:11 2018, gautam, Update, ALS, Fiber ALS assay
|
Wed Jan 24 00:33:31 2018, gautam, Update, ALS, Fiber ALS assay
|
Wed Jan 24 10:45:14 2018, gautam, Update, ALS, Fiber ALS assay
|
Thu Jan 25 23:59:14 2018, gautam, Update, ALS, Fiber ALS assay
|
Fri Jan 26 20:03:09 2018, gautam, Update, ALS, Fiber ALS assay
|
Wed Jan 31 15:45:22 2018, gautam, Update, ALS, Fiber ALS assay
|
Wed Jan 31 16:29:42 2018, gautam, Update, ALS, Modulation depths 
|
Wed Jan 31 16:33:53 2018, gautam, Update, ALS, ALS electronics at LSC rack
|
Wed Jan 31 22:32:11 2018, gautam, Update, ALS, ALS signal chain + power budget 
|
Thu Feb 1 01:24:56 2018, gautam, Update, ALS, D0902745 revamp underway
|
Fri Feb 2 00:26:34 2018, gautam, Update, ALS, D0902745 revamp underway
|
Fri Feb 2 13:16:55 2018, gautam, Update, ALS, ALS signals whitening switching 
|
Mon Feb 5 14:11:01 2018, gautam, Update, ALS, Huge harmonics in ALS channels 
|
Mon Feb 5 22:57:28 2018, gautam, Update, ALS, Huge harmonics in ALS channels
|
Tue Feb 6 11:13:26 2018, gautam, Update, ALS, Possible source of ground loop identified
|
Tue Feb 6 22:55:51 2018, gautam, Update, ALS, Possible source of ground loop identified
|
Thu Feb 8 00:33:20 2018, gautam, Update, ALS, D990694 characterization / THD measurement plan
|
Thu Feb 8 01:27:16 2018, Koji, Update, ALS, D990694 characterization / THD measurement plan
|
Fri Feb 9 13:37:44 2018, gautam, Update, ALS, THD measurement trial
|
Thu Feb 8 12:00:09 2018, gautam, Update, ALS, D990694 is NOT differential receiving
|
Thu Feb 8 13:13:14 2018, gautam, Update, ALS, D990694 pulled out  
|
Thu Feb 8 18:10:36 2018, gautam, Update, ALS, D990694 pulled out
|
Wed Feb 7 15:51:15 2018, gautam, Update, ALS, D0902745 revamp complete
|
Fri Feb 16 01:34:40 2018, gautam, Update, ALS, D0902745 in-situ testing 
|
Tue Feb 20 23:08:27 2018, gautam, Update, ALS, D0902745 in-situ testing
|
Thu Feb 22 00:09:11 2018, gautam, Update, ALS, D0902745 in-situ testing  
|
Sun Feb 25 00:03:12 2018, gautam, Update, ALS, Daughter board prototyping    
|
Mon Feb 26 20:55:56 2018, rana, Update, ALS, Daughter board prototyping
|
Tue Feb 27 21:10:45 2018, gautam, Update, ALS, Daughter board testing  
|
Wed Feb 28 19:13:25 2018, gautam, Update, ALS, ADC test for differential receiving in c1lsc
|
Fri Mar 2 01:45:06 2018, gautam, Update, ALS, new look ALS electronics
|
Mon Mar 5 17:27:34 2018, gautam, Update, ALS, new look ALS electronics - characterization
|
Thu Mar 8 00:40:25 2018, gautam, Update, ALS, new look ALS electronics - characterization
|
Thu Mar 8 19:38:37 2018, gautam, Update, ALS, digital unwhitening of daughter board
|
Thu Mar 8 23:50:27 2018, gautam, Update, ALS, First look at new ALS electronics
|
Fri Mar 9 01:07:01 2018, gautam, Update, ALS, First look at new ALS electronics
|
Mon Mar 12 22:08:31 2018, gautam, Update, ALS, Noisy POX
|
Mon Mar 12 23:57:31 2018, gautam, Update, ALS, Noisy POX 
|
Mon Mar 19 15:02:29 2018, gautam, Update, ALS, Noisy MC sensing
|
Thu Feb 1 15:31:12 2018, gautam, Update, ALS, ALS signal chain + power budget
|
Wed Feb 7 10:16:26 2018, gautam, Update, ALS, ALS signal chain + power budget
|
Thu Jan 25 13:18:41 2018, gautam, Update, ALS, Fiber ALS assay
|
|
Message ID: 13594
Entry time: Wed Jan 31 16:33:53 2018
In reply to: 13591
Reply to this: 13595
|
Author: |
gautam |
Type: |
Update |
Category: |
ALS |
Subject: |
ALS electronics at LSC rack |
|
|
[steve, gautam]
We installed some rails to mount the 2U chassis containing ~100m of delay line cabling, and the 1U chassis containing the FET demodulators for the ALS signals in the LSC rack. This has made it MUCH easier for a single person to work there and remove/reinstall these chassis. The delay line box has 100m of cable inside it, and so was rather heavy (~8kg) - previously, it was being supported only by a pair of brackets on the front, so the new arrangement is much more robust . Steve is looking into acquiring plastic spacers of the appropriate width, so that we can secure the units to the rack using usual rack mount screws (but the material of the newly installed rails and the screw heads holding them in place necessitate this plastic spacer).
Delay line box has been re-installed, demodulator chassis has been removed by me for characterization. Steve will put up photos once the units are re-installed.
For this work, I had to disconnect a bunch of cabling, but only those connected to ALS. All cables were labelled, and I will re-connect them once I am done with the demod chassis.
Quote: |
Anyways I think this is a big improvement from what was the situation before, and I am moving on to debugging the ALS electronics.
|
|