Wed Jan 24 13:55:04 2018, Kira, Summary, PEM, Seismometer can insulation test 6x
|
Thu Jan 25 12:41:18 2018, Kira, Update, PEM, Seismometer can insulation test
|
Thu Jan 25 14:58:20 2018, Kira, Update, PEM, Seismometer can insulation test
|
Thu Jan 25 16:39:09 2018, Kira, Update, PEM, Seismometer can insulation test
|
Thu Feb 1 16:09:13 2018, Kira, Update, PEM, Seismometer can insulation test
|
Mon Feb 5 12:12:41 2018, Kira, Update, PEM, Seismometer can insulation test
|
Wed Feb 7 12:35:56 2018, Kira, Update, PEM, Seismometer can insulation test
|
Wed Feb 7 17:01:25 2018, gautam, Update, PEM, PID test plan    
|
Wed Feb 7 19:14:19 2018, rana, Update, PEM, PID test plan
|
Thu Feb 8 12:24:37 2018, Kira, Update, PEM, PID test plan
|
Thu Feb 8 17:32:44 2018, Kira, Update, PEM, PID test plan   
|
Fri Feb 9 15:29:32 2018, Kira, Update, PEM, PID test plan
|
Thu Feb 15 16:03:57 2018, Kira, Update, PEM, PID test plan
|
Thu Feb 22 16:16:43 2018, Kira, Update, PEM, temp sensor input
|
Mon Feb 26 16:22:10 2018, Kira, Update, PEM, temp sensor input  
|
Wed Feb 28 12:31:28 2018, Kira, Update, PEM, temp sensor input
|
Fri Mar 9 12:59:53 2018, Kira, Update, PEM, ADC noise measurement 
|
Mon Mar 26 16:10:33 2018, Kira, Update, PEM, final setup sketch   
|
Wed Apr 18 12:18:39 2018, Kira, Update, PEM, final setup sketch 7x
|
Wed Apr 18 16:59:35 2018, rana, Update, PEM, final setup sketch: EX Seis
|
Thu Apr 19 11:29:11 2018, rana, Update, PEM, PID tune
|
Mon Apr 23 20:06:35 2018, rana, Update, PEM, PID tune
|
Thu Apr 26 19:46:26 2018, rana, Update, PEM, PID Quixote
|
Tue May 1 11:15:19 2018, Kira, Update, PEM, PID Quixote
|
Tue May 1 15:23:18 2018, Kira, Update, PEM, new ADC channel setup issue
|
Thu Apr 19 12:23:30 2018, Kira, Update, PEM, final setup sketch update 
|
Thu Apr 19 18:23:51 2018, Kira, Update, PEM, final setup sketch update
|
Fri Apr 20 15:07:45 2018, Kira, Update, PEM, final setup sketch update
|
Thu May 24 16:08:12 2018, Kira, Update, PEM, parts list
|
Tue May 29 16:22:43 2018, Kira, Update, PEM, parts list  
|
Wed Jun 6 15:12:29 2018, Kira, Update, PEM, parts from lab  
|
Mon Jun 18 11:12:23 2018, Kira, Summary, PEM, finishing up work at the lab  
|
Tue Apr 24 09:10:20 2018, Kira, Update, PEM, final setup sketch
|
Mon Apr 30 15:36:18 2018, Kira, Update, PEM, final setup sketch
|
Tue May 8 10:24:10 2018, Kira, Summary, PEM, plan for this week
|
Fri May 11 11:47:33 2018, johannes, Summary, PEM, Acromag issues
|
Tue May 15 15:13:23 2018, Kira, Summary, PEM, Acromag issues
|
Thu Mar 15 17:33:56 2018, Kira, Update, PEM, test setup
|
Tue Mar 20 16:56:01 2018, Kira, Update, PEM, test setup 
|
Tue Mar 20 19:48:10 2018, gautam, Update, PEM, test setup
|
Fri Mar 23 12:00:20 2018, rana, Update, PEM, test setup
|
Fri Mar 23 12:45:08 2018, Kira, Update, PEM, test setup
|
Thu May 17 15:38:19 2018, Kira, Update, PEM, test setup with seismometer   
|
Fri May 18 14:33:34 2018, Kira, Update, PEM, test setup with seismometer
|
Mon May 21 14:17:28 2018, Kira, Update, PEM, test setup with seismometer
|
Tue May 22 14:49:03 2018, Kira, Update, PEM, test setup with seismometer
|
Wed May 23 14:50:33 2018, Kira, Update, PEM, test setup with seismometer 
|
Thu May 24 15:18:12 2018, Kira, Update, PEM, PID loop restarted
|
Thu May 31 15:48:16 2018, Kira, Update, PEM, running PID script with seismometer
|
Mon May 21 10:15:35 2018, gautam, Update, PEM, test setup with seismometer
|
Wed Feb 28 21:14:34 2018, gautam, Summary, PEM, Channel admin
|
Tue Mar 27 11:11:16 2018, Kira, Update, PEM, Channel setup
|
Thu Mar 29 17:14:42 2018, Kira, Update, PEM, PID test
|
Fri Mar 30 06:16:45 2018, rana, Update, PEM, PID test
|
Fri Mar 30 16:10:46 2018, Kira, Update, PEM, PID test
|
Wed Apr 4 16:23:10 2018, Kira, Update, PEM, PID test  
|
Fri Apr 6 16:17:20 2018, Kira, Update, PEM, PID tuning
|
Fri Apr 6 18:28:57 2018, rana, Update, PEM, PID tuning
|
Mon Apr 9 16:30:21 2018, Kira, Update, PEM, MEDM setup
|
Tue Apr 10 15:42:08 2018, Kira, Update, PEM, MEDM setup
|
Thu Apr 12 10:15:33 2018, Kira, Update, PEM, MEDM setup
|
Fri Apr 13 00:20:46 2018, rana, Update, PEM, MEDM setup
|
|
Message ID: 13582
Entry time: Thu Jan 25 12:41:18 2018
In reply to: 13575
Reply to this: 13584
|
Author: |
Kira |
Type: |
Update |
Category: |
PEM |
Subject: |
Seismometer can insulation test |
|
|
We started the actual heating test today and it seems to be working so far. Hoping to heat it to about 40C. We also set up another temperature sensor to measure the lab temperature and connected it to J7, bottom.
Quote: |
Gautam and I set up the insulated seismometer can in the lab today. I had previously wired up the two heaters I placed onto the sides of the can in parallel to get a total resistance of 12.5 ohms and then I wrapped the whole can in 3 layers of insulation (k-factor 0.25). We placed it on a large sheet of insulation as to not crush the wires leading out the bottom of the can. I stuck on one of my AD590 sensors to the inside of the can onto the copper lining using duct tape, though this is only a temporary solution. In the future, it would be nice to have some sort of thermal clamp to secure the sensor to the can. To provide power to the heater circuit board and the temperature sensor board, we got a powerstrip and plugged in two power supplies and a function generator into it. The heater circuit (attachment 3) is powered by one of the power supplies and the function generator, while the temperature sensor (attachment 5) is stuck to the side of the can and is powered by the second power supply. The heater circuit's MOSFET (IRF640, attachment 4) is placed on a metal block and sandwiched between two more to make sure it doesn't move around. The temperature sensor is connected by a long BNC cable to the channels in attachment 6.
gautam: we plugged the BNC output of Kira's temperature sensor circuit to J7 on the AA input chassis in 1X2 - this corresponds to ADC1 input 12 in c1ioo. I then made a "PEM" namespace block inside the c1als model, and placed a single CDS filter module inside it (this can be used for calibration purposes). The filter module is named "C1:PEM-SEIS_EX_TEMP", and has the usual CDSfilt channels available. I DQ'ed the output of the filter module (@256 Hz, probably too high, but I'm holding off on a recompile for now). Recompilation and model restart of c1als went smoothly.
2 bench power supplies are being used for this test, we can think of a more permanent solution later.
**25 Jan noon: Added another filter module, "C1:PEM-SEIS_EX_TEMP", to which Kira is hooking up a second temperature sensor, which will serve as a monitor of the "Ambient" lab temperature. Added DQ channel for the output of this filter module, fixed sampling to 32Hz. Compile and restart went smooth.
|
|