40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Thu Jan 11 14:47:11 2018, Steve, Update, PSL, shelf work for tomorrow 
    Reply  Fri Jan 12 10:26:24 2018, Steve, Update, PSL, PSL shelf work schedule 
       Reply  Tue Jan 16 11:05:51 2018, gautam, Update, PSL, PSL shelf - AOM power connection interrupted 
          Reply  Tue Jan 16 16:18:47 2018, Steve, Update, PSL, new PSL shelf in place DSC00020.JPG
          Reply  Tue Jan 16 21:46:02 2018, gautam, Update, PSL, PSL shelf - AOM power connection interrupted 
Message ID: 13532     Entry time: Thu Jan 11 14:47:11 2018     Reply to this: 13538
Author: Steve 
Type: Update 
Category: PSL 
Subject: shelf work for tomorrow 

I have just received the scheduling of the PSL self work for tomorrow. Gautam and I agreed that if it is needed I will shut the laser off and cover the hole table with plastic.

ELOG V3.1.3-