40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Thu Jan 4 12:46:27 2018, gautam, Update, ALS, Fiber ALS assay FiberALS.pdfFiberALS.svg.zip
    Reply  Thu Jan 11 14:22:40 2018, gautam, Update, ALS, Fiber ALS assay 
       Reply  Thu Jan 11 20:51:20 2018, gautam, Update, ALS, Fiber ALS assay IMG_5112.JPG
          Reply  Tue Jan 16 21:50:53 2018, gautam, Update, ALS, Fiber ALS assay 
             Reply  Thu Jan 18 00:35:00 2018, gautam, Update, ALS, Fiber ALS assay IR_ALS_20180118.pdfC2B4C1DD-6528-4067-9C13-6BD248629AD6.MOV
                Reply  Fri Jan 19 11:34:21 2018, gautam, Update, ALS, Fiber ALS assay IR_ALS_20180119.pdf
                   Reply  Fri Jan 19 23:04:11 2018, gautam, Update, ALS, Fiber ALS assay 
                      Reply  Wed Jan 24 00:33:31 2018, gautam, Update, ALS, Fiber ALS assay IMG_6866.JPG
                         Reply  Wed Jan 24 10:45:14 2018, gautam, Update, ALS, Fiber ALS assay 
                         Reply  Thu Jan 25 23:59:14 2018, gautam, Update, ALS, Fiber ALS assay 
                            Reply  Fri Jan 26 20:03:09 2018, gautam, Update, ALS, Fiber ALS assay 
                               Reply  Wed Jan 31 15:45:22 2018, gautam, Update, ALS, Fiber ALS assay IMG_6875.JPG
                                  Reply  Wed Jan 31 16:29:42 2018, gautam, Update, ALS, Modulation depths PMCmodDepth.pdfXPDH.pdf
                                  Reply  Wed Jan 31 16:33:53 2018, gautam, Update, ALS, ALS electronics at LSC rack 
                                     Reply  Wed Jan 31 22:32:11 2018, gautam, Update, ALS, ALS signal chain + power budget FiberALS_PowerBudget.pdfpreampProposed.pdf
                                        Reply  Thu Feb 1 01:24:56 2018, gautam, Update, ALS, D0902745 revamp underway PSLinterlock.png
                                           Reply  Fri Feb 2 00:26:34 2018, gautam, Update, ALS, D0902745 revamp underway 
                                              Reply  Fri Feb 2 13:16:55 2018, gautam, Update, ALS, ALS signals whitening switching ALS_whitening_switching.pdfALS_whitening_switching_works.pdf
                                                 Reply  Mon Feb 5 14:11:01 2018, gautam, Update, ALS, Huge harmonics in ALS channels ALSpowerlineHarmonics.pdf2A1B3AC4-4059-416A-AD88-8AB0431D7A55.jpeg
                                                    Reply  Mon Feb 5 22:57:28 2018, gautam, Update, ALS, Huge harmonics in ALS channels 
                                                       Reply  Tue Feb 6 11:13:26 2018, gautam, Update, ALS, Possible source of ground loop identified A68AF89C-E8A9-416D-BBD2-A1AD0A51E0B5.jpeg
                                                          Reply  Tue Feb 6 22:55:51 2018, gautam, Update, ALS, Possible source of ground loop identified 
                                                       Reply  Thu Feb 8 00:33:20 2018, gautam, Update, ALS, D990694 characterization / THD measurement plan D990694THD_trial.pdf
                                                          Reply  Thu Feb 8 01:27:16 2018, Koji, Update, ALS, D990694 characterization / THD measurement plan 
                                                          Reply  Fri Feb 9 13:37:44 2018, gautam, Update, ALS, THD measurement trial THD_trial.pdf
                                                       Reply  Thu Feb 8 12:00:09 2018, gautam, Update, ALS, D990694 is NOT differential receiving 
                                                          Reply  Thu Feb 8 13:13:14 2018, gautam, Update, ALS, D990694 pulled out IMG_5131.JPGIMG_5133.JPGD990694-B_cuttingPlan.pdf
                                                             Reply  Thu Feb 8 18:10:36 2018, gautam, Update, ALS, D990694 pulled out 
                                              Reply  Wed Feb 7 15:51:15 2018, gautam, Update, ALS, D0902745 revamp complete 6613CD37-5014-44AE-B1FE-6F6A8137DF62.jpeg
                                                 Reply  Fri Feb 16 01:34:40 2018, gautam, Update, ALS, D0902745 in-situ testing BeatMouthX_20180216.pdfIMG_5134.JPG
                                                    Reply  Tue Feb 20 23:08:27 2018, gautam, Update, ALS, D0902745 in-situ testing BeatMouthX_20180220_diffOut.pdf
                                                       Reply  Thu Feb 22 00:09:11 2018, gautam, Update, ALS, D0902745 in-situ testing daughterBoard_TF.pdfdaughterBoard_noise.pdfIMG_6906.JPG
                                                          Reply  Sun Feb 25 00:03:12 2018, gautam, Update, ALS, Daughter board prototyping schematic.pdfdaughterBoard_TF.pdfdaughterBoard_noise.pdfTEK00000.PNGdaughterBoard_noise.pdf
                                                             Reply  Mon Feb 26 20:55:56 2018, rana, Update, ALS, Daughter board prototyping 
                                                                Reply  Tue Feb 27 21:10:45 2018, gautam, Update, ALS, Daughter board testing IMG_6912.JPGIMG_6913.JPGIMG_6914.JPG
                                                                   Reply  Wed Feb 28 19:13:25 2018, gautam, Update, ALS, ADC test for differential receiving in c1lsc c1lsc_ADCtest.png
                                                                   Reply  Fri Mar 2 01:45:06 2018, gautam, Update, ALS, new look ALS electronics IMG_6916.JPG
                                                                      Reply  Mon Mar 5 17:27:34 2018, gautam, Update, ALS, new look ALS electronics - characterization BeatMouthX_20180305_diffOut.pdf
                                                                         Reply  Thu Mar 8 00:40:25 2018, gautam, Update, ALS, new look ALS electronics - characterization BeatMouthX_20180305_diffOut.pdf
                                                                            Reply  Thu Mar 8 19:38:37 2018, gautam, Update, ALS, digital unwhitening of daughter board TFfit.pdf
                                                                               Reply  Thu Mar 8 23:50:27 2018, gautam, Update, ALS, First look at new ALS electronics BeatMouth_OOL.pdf
                                                                                  Reply  Fri Mar 9 01:07:01 2018, gautam, Update, ALS, First look at new ALS electronics ALS_vs_POXnoise.pdf
                                                                                     Reply  Mon Mar 12 22:08:31 2018, gautam, Update, ALS, Noisy POX NoisyPOX_20180312.pdf
                                                                                        Reply  Mon Mar 12 23:57:31 2018, gautam, Update, ALS, Noisy POX NoisyPOXandPOY_20180312.pdfnoisyPOX_Jan2018.pdf
                                                                                           Reply  Mon Mar 19 15:02:29 2018, gautam, Update, ALS, Noisy MC sensing 
                                        Reply  Thu Feb 1 15:31:12 2018, gautam, Update, ALS, ALS signal chain + power budget 
                                        Reply  Wed Feb 7 10:16:26 2018, gautam, Update, ALS, ALS signal chain + power budget 
                      Reply  Thu Jan 25 13:18:41 2018, gautam, Update, ALS, Fiber ALS assay preampProposed.pdf
Message ID: 13531     Entry time: Thu Jan 11 14:22:40 2018     In reply to: 13502     Reply to this: 13534
Author: gautam 
Type: Update 
Category: ALS 
Subject: Fiber ALS assay 

I did a cursory check of the ALS signal chain in preparation for commissioning the IR ALS system. The main elements of this system are shown in my diagram in the previous elog in this thread.

Questions I have:

  1. Does anyone know what exactly is inside the "Delay Line" box? I can't find a diagram anywhere.
    • Jessica's SURF report would suggest that there are just 2 50m cables in there.
    • There are two power splitters taped to the top of this box.
    • It is unclear to me if there are any active components in the box.
    • It is unclear to me if there is any thermal/acoustic insulation in there.
    • For completeness, I'd like to temporarily pull the box out of the LSC rack, open it up, take photos, and make a diagram unless there are any objections.
  2. If you believe the front panel labeling, then currently, the "LO" input of the mixer is being driven by the part of the ALS beat signal that goes through the delay line. The direct (i.e. non delayed) output of the power splitter goes to the "RF" input of the mixer. The mixer used, according to the DCC diagram, is a PE4140. Datasheet suggests the LO power can range from -7dBm to +20dBm. For a -8dBm beat from the IR beat PDs, with +24dB gain from the ZHL3A but -3dB from the power splitter, and assuming 9dB loss in the cable (I don't know what the actual loss is, but according to a Frank Seifert elog, the optimal loss is 8.7dB and I assume our delay line is close to optimal), this means that we have ~4dBm at the "LO" input of the demod board. The schematic says the nominal level the circuit expects is 10dBm. If we use the non-delayed output of the power splitter, we would have, for a -8dBm beat, (-8+24-3)dBm ~13dBm, plus probably some cabling loss along the way which would be closer to 10dBm. So should we use the non-delayed version for the LO signal? Is there any reason why the current wiring is done in this way?

 

ELOG V3.1.3-