40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 1317     Entry time: Wed Feb 18 03:17:40 2009
Author: Yoichi 
Type: Update 
Category: LSC 
Subject: Locking  
Yoichi, Kakeru,

Last night, the cm_step script failed at the hand-off of CARM error signal from TR_DC to PO_DC.
This was fixed by reducing the PO_DC gain by a factor of 2.
Currently the script fails when changing C1:LSC-DEMOD_GAIN to zero.
To be honest, I don't fully understand the purpose of this step.
ELOG V3.1.3-