40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Thu Apr 13 21:01:20 2017, rana, Configuration, Computers, LG UltraWide on Rossa LG34c.jpgcrack.jpg
    Reply  Wed May 3 16:12:36 2017, johannes, Configuration, Computers, catastrophic multiple monitor failures monfight.jpg
       Reply  Wed May 3 16:46:18 2017, Koji, Configuration, Computers, catastrophic multiple monitor failures 
       Reply  Thu May 4 09:52:43 2017, rana, Configuration, Computers, catastrophic multiple monitor failures 
          Reply  Tue May 9 15:23:12 2017, Steve, Configuration, Computers, catastrophic multiple monitor failures Trip-Lite.jpg
             Reply  Mon May 15 20:43:25 2017, rana, Configuration, Computers, catastrophic multiple monitor failures 
                Reply  Wed Aug 2 15:04:15 2017, gautam, Configuration, Computers, control room workstation power distribution 
Message ID: 13160     Entry time: Wed Aug 2 15:04:15 2017     In reply to: 12993
Author: gautam 
Type: Configuration 
Category: Computers 
Subject: control room workstation power distribution 

The 4 control room workstation CPUs (Rossa, Pianosa, Donatella and Allegra) are now connected to the UPS.

The 5 monitors are connected to the recently acquired surge-protecting power strips.

Rack-mountable power strip + spare APC Surge Arrest power strip have been stored in the electronics cabinet.

Quote:

this is not the right one; this Ethernet controlled strip we want in the racks for remote control.

Buy some of these for the MONITORS.

 

ELOG V3.1.3-