Wed Jan 25 15:41:29 2017, Lydia, Update, IMC, 29.5 MHz modulation depth measurement plan
|
Wed Jan 25 17:30:03 2017, Koji, Update, IMC, 29.5 MHz modulation depth measurement plan
|
Wed Jan 25 19:39:07 2017, gautam , Update, IMC, 29.5 MHz modulation depth measurement plan
|
Fri Jan 27 21:25:11 2017, Lydia, Update, IMC, 29.5 MHz modulation depth
|
Sat Jan 28 01:25:51 2017, gautam, Update, IMC, 29.5 MHz modulation depth 
|
Mon Jan 30 19:07:48 2017, gautam, Update, IMC, RF AM stabilization box pulled out
|
Tue Jan 31 01:07:20 2017, Lydia, Update, IMC, RF AM stabilization box pulled out
|
Tue Jan 31 13:46:34 2017, rana, Update, IMC, RF AM stabilization box pulled out
|
Tue Jan 31 14:17:48 2017, gautam, Update, IMC, RF AM stabilization box pulled out
|
Tue Jan 31 22:07:13 2017, gautam, Update, IMC, RF AM stabilization box revamp
|
Tue Jan 31 22:28:39 2017, Lydia, Update, IMC, RF AM stabilization box pulled out
|
Wed Feb 1 11:51:19 2017, Koji, Update, IMC, RF AM stabilization box pulled out
|
Wed Feb 1 16:45:56 2017, Lydia, Update, IMC, RF AM stabilizer box Modification Plan
|
Wed Feb 1 20:49:34 2017, rana, Update, IMC, RF AM stabilizer box Modification Plan
|
Wed Feb 1 23:13:30 2017, Lydia, Update, IMC, RF AM stabilizer box Modification Plan
|
Sun Feb 5 21:56:50 2017, Lydia, Update, IMC, 29.5 MHz stabilizer box replacement
|
Tue Feb 7 12:01:10 2017, Lydia, Update, IMC, 29.5 MHz stabilizer box replacement
|
Tue Feb 7 17:00:55 2017, Lydia, Update, IMC, 29.5 MHz stabilizer box replacement
|
Fri Feb 10 02:14:10 2017, gautam, Update, IMC, 29.5 MHz stabilizer box replacement
|
Fri Feb 10 11:41:43 2017, Lydia, Update, IMC, 29.5 MHz stabilizer box replacement
|
Fri Feb 10 13:24:28 2017, rana, Update, IMC, 29.5 MHz stabilizer box replacement
|
Fri Feb 10 18:21:21 2017, gautam, Update, IMC, IMC Demod board
|
Fri Feb 10 19:32:15 2017, Koji, Update, IMC, IMC Demod board
|
Sun Feb 12 01:16:57 2017, gautam, Update, IMC, IMC length loop - summary of changes    
|
Mon Feb 13 11:55:14 2017, rana, Update, IMC, IMC length loop - summary of changes
|
Mon Feb 13 13:34:44 2017, gautam, Update, IMC, IMC length loop - bad SMA cable replaced
|
Mon Feb 13 19:44:55 2017, Lydia, Update, IMC, Front panel for 29.5 MHz amplifier box
|
Wed Mar 1 21:15:40 2017, Lydia, Update, IMC, Front panel for 29.5 MHz amplifier box
|
Wed Mar 1 23:56:09 2017, gautam, Update, IMC, Front panel for 29.5 MHz amplifier box
|
Thu Mar 2 20:32:18 2017, Lydia, Update, IMC, Front panel for 29.5 MHz amplifier box
|
Wed Feb 15 23:54:13 2017, gautam, Update, IMC, IMC saga continues... 
|
Fri Feb 17 20:10:18 2017, gautam, Update, IMC, WFS servos turned back on
|
Sat Feb 18 14:09:06 2017, rana, Update, IMC, WFS servos turned back on
|
Sat Feb 18 21:50:48 2017, gautam, Update, IMC, WFS servos turned back on
|
Sun Mar 5 12:41:23 2017, gautam, Update, IMC, WFS servo-steppin  
|
|
Message ID: 12773
Entry time: Tue Jan 31 13:46:34 2017
In reply to: 12772
Reply to this: 12775
|
Author: |
rana |
Type: |
Update |
Category: |
IMC |
Subject: |
RF AM stabilization box pulled out |
|
|
- What is the probe situation? Ought to use a high impedance FET probe to measure this or else the scope would load the circuit.
- The ERA amplifiers are known to slowly die over ~10 year times scales. Search our ELOG for ERA-5. We'll have to replace some; ask Steve to order if we don't have many in the Plateau Tournant.
- What kind of HELA are the HELA amplifiers? Please a link to the data sheet if you can find it. I wonder what the gain and NF are at 30 MHz. I think the HELA-10D should be a good variant.
|